June
17,
2011
The
City
of
Houston
Boiler
Board:
This
is
to
introduce
Edward
James
Hoar.
Edward
has
been
operating
the
following
boilers
since
July
3,
2010
until
present.
Brand
Names:
State
Numbers:
Horsepower:
Operating
Pressure:
Use
of
Boilers:
Location
of
Boilers:
350
Hp
Cleaver
Brooks
Boiler
Firetube
200
Hp
Cleaver
Brooks
Boiler
Firetube
MA
74698
MA
116725
350
Hp
200Hp
90
Psi
Food
Production,
Process
steam,
Comfort
Heat
262
Primrose
Street
Haverhill,
MA
01830
Based
upon
Edward’s
time
operating
the
above
boilers,
please
allow
this
person
to
exam
for
the
2nd
or
3rd
Grade
Stationary
Engineer
Test.
Respectfully,
Todd
Dion
3rd
Class
Engineer/
Chief
Engineer
of
Plant
#007071