book ripear (PDF)




File information


Title: Untitled-2
Author: jayprakash

This PDF 1.5 document has been generated by CorelDRAW X6 / Corel PDF Engine Version 16.0.0.707, and has been sent on pdf-archive.com on 19/04/2014 at 08:55, from IP address 117.203.x.x. The current document download page has been viewed 839 times.
File size: 18.92 MB (48 pages).
Privacy: public file
















File preview


UDGAM

Half Yearly Magazine of Birla Carbon Renukoot

July to December
2013

Edition
4

Highlight of Magazine…
Index
S. No.

Content

Page Number

1.

Unit Head’s Desk

1

2.

Technical Changes

2-3

3.

Safety

4-7

4.

Customer Visit

8

5.

Dignitary Visit

9

6.

Journey to Excellence

7.

Proud Moments

8.

Way of Sustainability

13 - 19

9.

Rewards & Recognitions

20 - 22

10.

People Management

23 - 41

11.

Fun Corner

42

12.

Slogan & Pomes

43

13.

Health is Wealth

44

14.

Happy Marriage

45

15.

New Borne

46

10 - 11
12

Editorial Board

Gaurav Jain
Vinod Khare
Sanjay Sharma

Rahul Baliyan
Vandana Chaurasia

Wishing you all a very Happy & Prosperous 2014 !
We have passed through some challenging times in 2013 and your sincere

WCM Award, 2013
Your spirit in initiating new projects and continuously accepting change has enabled us to complete most
3 conversion of the reactors bear testimony

The good ratings given by some of our major customers has only increased our responsibility in retaining
is another milestone in our commitment
towards sustainability.
The CSR activities continued in full swing. It was a proud moment when many of you extended support in
distributing blankets to a section of the under privileged members of the society.
The constant involvement of your families in various socio-cultural activities like
Diwali added colour

, Dandia ,Picnic and

Once again wishing you all the best in all the endeavour that you are going to take in 2014.

With best wishes & regards,
Ritajit Som
Unit Head

Gantry lifting:

OnlineRe-run System
:

HT cable termination & Lightening Arrestor
was lifted by 2 mtr to avoid electrical hazard &
stoppage of power transmission due to
.

Screw Conveyor for Silo 8 to L-2
Mixer
successfully installed. This has resulted in
stoppage of Manual packing of Silo No.8
material.

NC3 Conversion of Hard BlackReactors:
Hard Black Reactors converted to new NC3 design with bricks from M/s.Rath.

Refurbished APH installationin HB RX-C:
Old leaky APH was reconditioned with new
tubes & compensators and installed in HB RXC. This resulted in increase of Hot Air
temperature by 50 Deg. This inhouse repair
saved about Rs.1.5 Crore.

Installationof Mass Flow Meter in Cold
side:
Through this initiative, choking of Mass
Flow Meter stopped.

Mock Drill






Download book ripear



book_ripear.pdf (PDF, 18.92 MB)


Download PDF







Share this file on social networks



     





Link to this page



Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..




Short link

Use the short link to share your document on Twitter or by text message (SMS)




HTML Code

Copy the following HTML code to share your document on a Website or Blog




QR Code to this page


QR Code link to PDF file book_ripear.pdf






This file has been shared publicly by a user of PDF Archive.
Document ID: 0000157942.
Report illicit content