This PDF 1.5 document has been generated by CorelDRAW X6 / Corel PDF Engine Version 16.0.0.707, and has been sent on pdf-archive.com on 19/04/2014 at 08:55, from IP address 117.203.x.x.
The current document download page has been viewed 839 times.
File size: 18.92 MB (48 pages).
Privacy: public file
UDGAM
Half Yearly Magazine of Birla Carbon Renukoot
July to December
2013
Edition
4
Highlight of Magazine…
Index
S. No.
Content
Page Number
1.
Unit Head’s Desk
1
2.
Technical Changes
2-3
3.
Safety
4-7
4.
Customer Visit
8
5.
Dignitary Visit
9
6.
Journey to Excellence
7.
Proud Moments
8.
Way of Sustainability
13 - 19
9.
Rewards & Recognitions
20 - 22
10.
People Management
23 - 41
11.
Fun Corner
42
12.
Slogan & Pomes
43
13.
Health is Wealth
44
14.
Happy Marriage
45
15.
New Borne
46
10 - 11
12
Editorial Board
Gaurav Jain
Vinod Khare
Sanjay Sharma
Rahul Baliyan
Vandana Chaurasia
Wishing you all a very Happy & Prosperous 2014 !
We have passed through some challenging times in 2013 and your sincere
WCM Award, 2013
Your spirit in initiating new projects and continuously accepting change has enabled us to complete most
3 conversion of the reactors bear testimony
The good ratings given by some of our major customers has only increased our responsibility in retaining
is another milestone in our commitment
towards sustainability.
The CSR activities continued in full swing. It was a proud moment when many of you extended support in
distributing blankets to a section of the under privileged members of the society.
The constant involvement of your families in various socio-cultural activities like
Diwali added colour
, Dandia ,Picnic and
Once again wishing you all the best in all the endeavour that you are going to take in 2014.
With best wishes & regards,
Ritajit Som
Unit Head
Gantry lifting:
OnlineRe-run System
:
HT cable termination & Lightening Arrestor
was lifted by 2 mtr to avoid electrical hazard &
stoppage of power transmission due to
.
Screw Conveyor for Silo 8 to L-2
Mixer
successfully installed. This has resulted in
stoppage of Manual packing of Silo No.8
material.
NC3 Conversion of Hard BlackReactors:
Hard Black Reactors converted to new NC3 design with bricks from M/s.Rath.
Refurbished APH installationin HB RX-C:
Old leaky APH was reconditioned with new
tubes & compensators and installed in HB RXC. This resulted in increase of Hot Air
temperature by 50 Deg. This inhouse repair
saved about Rs.1.5 Crore.
Installationof Mass Flow Meter in Cold
side:
Through this initiative, choking of Mass
Flow Meter stopped.
Mock Drill
book_ripear.pdf (PDF, 18.92 MB)
Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..
Use the short link to share your document on Twitter or by text message (SMS)
Copy the following HTML code to share your document on a Website or Blog