PDF Archive

Easily share your PDF documents with your contacts, on the Web and Social Networks.

Share a file Manage my documents Convert Recover PDF Search Help Contact



Safe Work Procedure for Internal Human Traffic Mgmt Plan .pdf


Original filename: Safe Work Procedure for Internal Human Traffic Mgmt Plan.pdf
Title: Safe Work Procedure for Internal Human Traffic Mgmt Plan
Author: tana01

This PDF 1.4 document has been generated by PDFCreator Version 1.2.3 / GPL Ghostscript 9.04, and has been sent on pdf-archive.com on 08/05/2014 at 08:46, from IP address 167.25.x.x. The current document download page has been viewed 463 times.
File size: 392 KB (8 pages).
Privacy: public file




Download original PDF file









Document preview


S.O.P. NO.
TITLE
FACILITY
INITIATED BY
REVIEW DATE

SAFE WORK PROCEDURE
HSE-SWP-0027
EFFECTIVE DATE : 29 APRIL 2014
WEST SINGAPORE PLANT INTERNAL HUMAN TRAFFIC
MANAGEMENT PLAN
WPS, SINGAPORE
ALVIN JAZZ TAN CHIN CHUAN
Page
of 8
1

REVISION RECORD SHEET
Rev Details of Change
No
0
Original issue.

Reviewer
Alvin Jazz Tan

Effective
Date
29 APRIL
2014

S.O.P. NO.
TITLE
FACILITY
INITIATED BY
REVIEW DATE
1.

SAFE WORK PROCEDURE
HSE-SWP-0027
EFFECTIVE DATE : 29 APRIL 2014
WEST SINGAPORE PLANT INTERNAL HUMAN TRAFFIC
MANAGEMENT PLAN
WPS, SINGAPORE
ALVIN JAZZ TAN CHIN CHUAN
Page
of 8
2

PURPOSE

The objective of this procedure is to define the internal human traffic
management plan for west employees travelling by foot from the main
gate to their respective offices and travelling in and out of the
warehouse to reduce the possibility of injury to persons due to collision
with moving machinery and equipment
2.

SCOPE

This procedure is applicable to all employees or transient employee who
need to access the warehouse facility frequently and employees who
arrived at the main gate and travel by foot to their respective office
3.

DEFINITION
Internal Human Traffic Management Plan
Identified designated location where controlled human movement
within the plant is required due to the hazards/risks associated with
the location activity
WPSS
The abbreviations for West Pharmaceutical Services Singapore Pte Ltd
Warehouse Facility
Any location within the warehouse

4.

SAFETY / ENVIRONMENT
At the minimum employee travelling to the warehouse by foot shall
don the safety shoes

S.O.P. NO.
TITLE
FACILITY
INITIATED BY
REVIEW DATE

5.

SAFE WORK PROCEDURE
HSE-SWP-0027
EFFECTIVE DATE : 29 APRIL 2014
WEST SINGAPORE PLANT INTERNAL HUMAN TRAFFIC
MANAGEMENT PLAN
WPS, SINGAPORE
ALVIN JAZZ TAN CHIN CHUAN
Page
of 8
3

INSTRUCTION
5.1 West Pharmaceutical Services Singapore internal human traffic
management plan and identified human walkway shall be
adhered to by all employees when arriving at the main gate for
work either by the company bus transport or by the public
transport
Employee arriving at the main gate
5.11

Employee shall keep to the side of the road when
alighting at the main gate from company bus
transport or public transport

5.12

Take the identified designated route which are clearly
identified by demarcated yellow lines or yellow colored
foot print painted on the floor right after the security
post stairways and keeping off the vehicle driveway

5.13

Follow the direction of the demarcated yellow lines and
foot prints to the respective offices located in the
admin building and keeping off the vehicle driveway

Site map on designated route which admin building office
employee shall adhere to upon their arrival at the main gate

S.O.P. NO.
TITLE
FACILITY
INITIATED BY
REVIEW DATE

SAFE WORK PROCEDURE
HSE-SWP-0027
EFFECTIVE DATE : 29 APRIL 2014
WEST SINGAPORE PLANT INTERNAL HUMAN TRAFFIC
MANAGEMENT PLAN
WPS, SINGAPORE
ALVIN JAZZ TAN CHIN CHUAN
Page
of 8
4

S.O.P. NO.
TITLE
FACILITY
INITIATED BY
REVIEW DATE

SAFE WORK PROCEDURE
HSE-SWP-0027
EFFECTIVE DATE : 29 APRIL 2014
WEST SINGAPORE PLANT INTERNAL HUMAN TRAFFIC
MANAGEMENT PLAN
WPS, SINGAPORE
ALVIN JAZZ TAN CHIN CHUAN
Page
of 8
5

5.2 Employee commuting to work by means of motor cycle shall also
adhere strictly to the internal human traffic management plan
and identified human traffic walkway
Employee commuting to work by their own motor cycle and
arriving at the motor cycle shed
5.21

Take the identified designated route from the motor
cycle shed, crossed the warehouse gate using zebra
crossing en-route from the metal staircase to the
employee locker room and to the gowning room

Site map on designated route which employee arriving at the
motor cycle shed should adhere

S.O.P. NO.
TITLE
FACILITY
INITIATED BY
REVIEW DATE

SAFE WORK PROCEDURE
HSE-SWP-0027
EFFECTIVE DATE : 29 APRIL 2014
WEST SINGAPORE PLANT INTERNAL HUMAN TRAFFIC
MANAGEMENT PLAN
WPS, SINGAPORE
ALVIN JAZZ TAN CHIN CHUAN
Page
of 8
6

S.O.P. NO.
TITLE
FACILITY
INITIATED BY
REVIEW DATE

SAFE WORK PROCEDURE
HSE-SWP-0027
EFFECTIVE DATE : 29 APRIL 2014
WEST SINGAPORE PLANT INTERNAL HUMAN TRAFFIC
MANAGEMENT PLAN
WPS, SINGAPORE
ALVIN JAZZ TAN CHIN CHUAN
Page
of 8
7

5.3 Warehouse facility is a restricted entry facility and only
authorized employee and contractor are allowed entry.
Employee and contractor travelling by foot to access and
egress the warehouse office on business ground shall
5.31

Take the identified designated route which is clearly
demarcated by yellow lines drawn on warehouse facility
flooring from the area after the purified water treatment
plant to the warehouse office

5.3.2

Authorized employee shall walk within the yellow
demarcated lines at all times whenever
accessing or egressing the warehouse office

5.3.3

Authorized employee shall not walk out of the
demarcated yellow lines boundary

5.3.4

Non warehouse employees shall not loiter or be found
in the aisles of all storage racking located within the
warehouse facility

Site map on designated route which employee shall adhere to
when accessing and egressing the warehouse office

S.O.P. NO.
TITLE
FACILITY
INITIATED BY
REVIEW DATE

SAFE WORK PROCEDURE
HSE-SWP-0027
EFFECTIVE DATE : 29 APRIL 2014
WEST SINGAPORE PLANT INTERNAL HUMAN TRAFFIC
MANAGEMENT PLAN
WPS, SINGAPORE
ALVIN JAZZ TAN CHIN CHUAN
Page
of 8
8


Related documents


safe work procedure for internal human traffic mgmt plan
employee medical examination screening procedure
trimming operation line clearance safe work procedure rev 1
hsse equality policies and csr
zachary t pritchett resume
sop


Related keywords