Schedule 2 redacted version (PDF)




File information


Author: AAZA

This PDF 1.4 document has been generated by Aspose Ltd. / Aspose.Pdf for .NET 7.6.0, and has been sent on pdf-archive.com on 09/11/2014 at 11:53, from IP address 82.45.x.x. The current document download page has been viewed 539 times.
File size: 6.98 MB (80 pages).
Privacy: public file
















File preview


Schedule 2 - Authority's Requirements

SCHEDULE 2

AUTHORITY'S REQUIREMENTS

SOUTH LONDON WASTE PARTNERSHIP

RESIDUAL WASTE TREATMENT SERVICE

SCHEDULE 2
AUTHORITY'S REQUIREMENTS

Schedule 2

TABLE OF CONTENTS

Overview
2
PART 1: PERFORMANCE REQUIREMENTS

6

PR1 - WORKS REQUIREMENTS

7

PR2 - COMMISSIONING REQUIREMENTS

16

PR3 - SERVICES REQUIREMENTS

18

PR3.1 Diversion Targets

18

PR3.2 Environmental Management
PR3.3 Operational

Interface

18
21

PR3.4 Facilities and Contract Management

27

PR4 - HANDBACK REQUIREMENTS

34

APPENDIX A -WORKS QUALITY STANDARDS

36

PART 2: PERFORMNCE MANAGEMENT FRAMEWORK

37

PART 3: DEFINITIONS

74

Schedule 2

OVERVIEW

Introduction

.

.
.
.
Project Objective

.

.

Scope of the Service

. ---..
Schedule 2

-Partnership Working

.
.

--

Contract Waste

.

Contract Waste Category A ("Core" Contract Waste streams)

.
-

---- -. --.
.
..... ---

Contract Waste Category B ("Specialist" Contract Waste streams)

Schedule 2

-..

.-..

Contract Waste Category C ("Ad-hoc" Contract Waste streams)

..

- .
---

--.

.
Waste Quantity and Composition

Schedule 2

.

.

-

Schedule 2

PART 1: PERFORMANCE REQUIREMENTS

Part 1 of this Schedule defines the Performance Requirements and is divided into the
following parts:
·
·
·
·

PR1:
PR2:
PR3:
PR4:

Works Requirements
Commissioning Requirements
Services Requirements
Handback Requirements

Appendix A: Works Quality Standards

Subject to the express provisions of the Contract, the Contractor shall comply with the
Works, Commissioning, Services and Handback Requirements in accordance with the

Performance Requirements set out in PR1 to PR4 of Part 1 of this Schedule.

Sections of the Performance Requirements set out Part 1 of this Schedule are subject to

the Performance Management Framework regime set out in Part 2 of this Schedule.

Schedule 2

SCHEDULE 2
AUTHORITY'S REQUIREMENTS
PART 1
PERFORMANCE REQUIREMENTS

PR1 - WORKS REQUIREMENTS

General
1.1 The Contractor shall design and construct the Works in accordance with the Works
Delivery Plan to meet the requirements of PR1.

1.2 The Contractor shall provide Works appropriate for it to manage all Contract Waste
and to process such Contract Waste to meet the requirements of PR3.

1.3 As a minimum, the Works shall meet the Works Quality Standards included in
Appendix A.

.
.

Design and Delivery Requirements

1.6 The Contractor shall provide Works at the Beddington Lane Site and Viliers Road
Site that shall be suitable and efficient for the reception of all vehicles bringing

Contract Waste to the Sites and for vehicle egress from the Sites. The Sites shall be
capable of accepting all vehicles of a size up t

1.7 The Works shall be designed and constructed to ensure that all waste processing
treatment and product storage takes place within enclosed buildings or structures

with appropriate environmental controls provided.
1.8

Schedule 2






Download Schedule 2 redacted version



Schedule 2 redacted version.pdf (PDF, 6.98 MB)


Download PDF







Share this file on social networks



     





Link to this page



Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..




Short link

Use the short link to share your document on Twitter or by text message (SMS)




HTML Code

Copy the following HTML code to share your document on a Website or Blog




QR Code to this page


QR Code link to PDF file Schedule 2 redacted version.pdf






This file has been shared publicly by a user of PDF Archive.
Document ID: 0000193185.
Report illicit content