ESI: Per excavation shoring notes on
A3.10A and A3.11A, typical vertical
shoring to be 1'-0" clear to existing
foundation and slab on grade construction
CL
CL
CL
TOP OF PILE
2785 WHITNEY DR.
FAIRFIELD CA 94533
TEL. (415) 889-0878
A
S2.0
ESI: Indicate maximum criteria for
sloped and benched excavations
- see excavation and shoring
notes per A3.10A and A3.11A
DETAIL A
SCALE:1":1.0'
CLARK LIBRARY
UCLA SHORING
PLAN
BOTTOM OF EXCAVATION
BOTTOM OF EXCAVATION
B
S2.0
DETAIL B
SCALE:1":1.0'
UCLA
BOTTOM OF PILE
01
S2.0
SHORING SECTION
BOTTOM OF PILE
C
S2.0
DETAIL C
SCALE:1":1.0'
SCALE:1/2":1.0'
ESI: Indicate reinforcing for
drilled pier and anchorage or
embedment for steel pile to
concrete pier
02
S2.0
SHORING ELEVATION
SCALE:1/2":1.0'
ABP
08/13/2015
ESI: Confirm item #7 with
University's Representative
Per KM's email on 9/17: University is okay with
leaving the piles in place, provided that they are
trimmed down to a minimum of 3' below grade and
noted on the as-built drawings.