Impact

Public
Service

Traffic

Water and
Wastewater

Stormwater
Climate
Change

 

Mitigtion

Add facilities (one picnic table and one tennis
court) in Carrboro Town Commons
Provide more capacity of McDougle Middle School
Increase teachers in Town
Use building and occupancy permit for fire safety
Add vehicles for the police station and the fire
station
Build a new fire station in north Carrboro
Add a traffic signal and build crosswalks
Add a right-turn lane and increasing the number of
lanes in the long term
Allocate some office space to parking space
Provide shuttles at PM Peak Hour
Design a car-pool system for employees and
residents in Roberson Square
Widen sidewalks from Roberson Square to bus
stops
Build sheltered bus stops
Improve sharrows
Provide bike parking and way signs to bus stops
Complete the OWASA expansion project
Install Pipe 8 with other materials to increase
velocity
Use water-efficiency facilities
Install a sprinkler system
Improve sewerage maintenance
Increase Mason Farm Treatment Plant capacity
Enlarge wastewater piples
Build an infiltration trench and a grass swale
Use some concrete grid pavement
Build a bioretention (optional)
Use lower CDIR construction materials
Use energy efficient design (solar power system)
Increase nuclear energy

3  

Responsibility
The
Developer
Town