MDWASD PSIP Weekly Program Status Report RRB 20160318 .pdf

File information


Original filename: MDWASD-PSIP-Weekly Program Status Report-RRB-20160318.pdf
Author: mmazer

This PDF 1.5 document has been generated by Microsoft® Excel® 2016, and has been sent on pdf-archive.com on 22/03/2016 at 15:42, from IP address 209.37.x.x. The current document download page has been viewed 348 times.
File size: 210 KB (2 pages).
Privacy: public file


Download original PDF file


MDWASD-PSIP-Weekly Program Status Report-RRB-20160318.pdf (PDF, 210 KB)


Share on social networks



Link to this file download page



Document preview


Miami Dade Water and Sewer Department (MDWASD)
Pump Station Improvement Program (PSIP)
PSIP Weekly Status Report
Data Date: 3/18/2016
Planning &
Engineering Ongoing (Basins)

Planning &
Engineering
Completed

0815



SOW Negotiations

TA in Progress

MCC 7360/7040
Procurement

Design - % Complete

Construction - % Complete
(S): SACed and under Construction

Projects
Substantially
Complete

Submitted-As Complete
(SACed)

PS 0149 (On hold)

PS 0672

PS 0021 (On hold)

87%

PS 0614

PS 0147 (On hold) (S)

0%

PS 0607 (S)

PS 0161

0309

PS 0843

PS 0440 Ph. 2

PS 0109

11%

PS 0356

PS 0431 (S)

13%

PS 0334

FM 0194

0487

FM 0843 (Part of PS)

PS 0604 (S)

96%

FM 0065 Ph. 1

PS 0330

16%

PS 0336

PS 0473

32%

FM 0897

0196

I/I hold

PS 0700

PS 0431 Rev 1

PS 0439

87%

PS 0819

PS 0065 (S)

PS 0785

0530



PS 1002

PS 0604 Rev 1

PS 0698

2%

PS 0897

PS 0502

16%

PS 0500

PS 1004

0163

I/I hold

PS 0480

PS 0506

PS 0542

2%

PS 0860

FM 0431

77%

FM 0500

FM 0334

0645

PS 1058

PS 1056

PS 0331

0638

FM 0081 (Part of PS)

PS 0723

0724

PS 1065

0853

PS 0046

0215

PS 0102

0144

PS 0167
PS 0494

PS 1065 (Survey only)

99%

PS 0742

PS 0560

32%

0077
1020

I/I hold

87%

PS 0449

FM 0743

0%

PS 0399 (S)

PS 0527

PS 0836

32%

PS 1067

FM 0067

20%

PS 0495 (S)

PS 0503

PS 0069 (On hold)

16%

PS 0688

PS 0067

5%

FM 0604

PS 0871

PS 0794

87%

PS 0076

2%

PS 0842 (S)

PS 0201

PS 0124

62%

PS 0435

7%

PS 0113 (S)

PS 0114

32%

FM 0794

0%

PS 0609 (S)

0369

PS 0675

FM 0592

32%

0456

PS 0542

FM 0407 (On hold)

87%

0613

PS 1026

PS 0407 (On hold)

76%

1022

PS 0596

FM 0065 Ph. 2

41%

1306

PS 0870

62%

0648

PS 0026

87%

0877

PS 1068

62%

PS 0173 (On hold)

87%

0142

FM 0394

32%

1008

PS 0408 (AM) (On hold)

32%

0773

PS 0158

87%

1201

FM 0408 (On hold)

26%

PS 1311

FM 0158

87%

PS 0440 Ph. 1

32%

PS 0105

32%

PS 0081

2%



0442

27

18

Total number of On- going
Projects

PS 0743

30

8

12

9

12

LEGEND:



10

116
I/I Progress Table

Contractor

R&G

Contract Description

Contract % Complete

SSES - RPQ #P0144

88%

Contract Completion

Status

10//23/15

547,335.9 LF of pipe are completed out of the Contractual
620,749 LF of pipe. A non-compensable time extension
changed the SSES Contract end date from 9/25/15 to 10/23/15.
The pending 10% work include MHs & Pipes at Basins 0021,
0440, 0698 & 1002 that the Contractor and MDWASD could not
access.

Insitufrom

CIPP - RPQ #P0145

107%

4/5/2016

55,178 LF of pipe have been installed above the Contractual
51,465 LF of pipe.

V-Engineering

Dig & Replace - RPQ
#T1913

62%

5/17/2016

172 Work Orders have been completed out of 279 Work Orders
Issued.

TV Diversified

Manhole - RPQ # P0154

69%

7/13/2016

285 manholes have been completed out of the Contractual 415
manholes.

PSIP Program Status Report

Page 1 of 2

Print Date: 3/22/2016

2015 USEPA Deadline Projects
2016 USEPA Deadline Projects
2016 Special Projects
Project(s) entered a new Phase this week.
Projects On hold due to:
PS 0021 - Further research on-going to identify the lower wet well invert pipe Elev.
PS 0407 - Potential relocation of pump station.
FM 0407 - Potential relocation of PS 0407.
PS 0408 - Potential relocation of pump station.
FM 0408 - Potential relocation of PS 0408.
PS 0147 - Pending electrical upgrade design from FPL.
PS 0173 - MDWASD/PSIP Team reviewing SOW for this project.
PS 0149 - Design option being reviewed for reduction of SOW.

PSIP Program Status Report

Page 2 of 2

Print Date: 3/22/2016


Document preview MDWASD-PSIP-Weekly Program Status Report-RRB-20160318.pdf - page 1/2

Document preview MDWASD-PSIP-Weekly Program Status Report-RRB-20160318.pdf - page 2/2

Related documents


mdwasd psip weekly program status report rrb 20160318
gsa schedule contract
maynardlaw lettertomayor ionewastewaterrecommendations
the bridge q2 2012 volume 2
remote reactor monitoring 784480
order form adxc dc 39 001 blanik stc engl

Link to this page


Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..

Short link

Use the short link to share your document on Twitter or by text message (SMS)

HTML Code

Copy the following HTML code to share your document on a Website or Blog

QR Code

QR Code link to PDF file MDWASD-PSIP-Weekly Program Status Report-RRB-20160318.pdf