PDF Archive

Easily share your PDF documents with your contacts, on the Web and Social Networks.

Send a file File manager PDF Toolbox Search Help Contact



Basic Construction Work Techniques .pdf


Original filename: Basic Construction Work Techniques.pdf
Author: Administrator

This PDF 1.7 document has been generated by WPS Office / , and has been sent on pdf-archive.com on 06/04/2016 at 07:09, from IP address 183.128.x.x. The current document download page has been viewed 222 times.
File size: 160 KB (2 pages).
Privacy: public file




Download original PDF file









Document preview


Basic Construction Work Techniques
Have ground flated
Generally flat ground steps is often divided into two steps, namely first have the
area with large height difference. Until the height differences is within 20cm, have the
ground

divided into several parts and then flat them orderly.

Attentions:
Do not begin leveling the ground place when the bulldozers is placed inclined.
Observe the terrain ahead, and changes adjust the depth of bulldozer shovel
blade according to engine sound.
Usually the bulldozing depth a little bit thinner, keep moderate speed which
makes it easy to distinguish the sound of the engine changes.Small sound shows the
load increases which means the bulldozing depth relatively larger. At this time, you
can increase the throttle.
Tel:0086-516-83895528
Email:machinery@cnfocusgroup.com

Determine whether the ground is smooth enough according to the feeling of
sitting in the cab. If the shantui bulldozer is relatively stable while driving

that

shows the bulldozer already have the ground flated.
Look the blade tip and both sides of the terrain or adjust the bulldozing depth in
term of the distance between the track and push knife top.
Bulldozing mountainside
Construction in the mountains, at the foot of the mountain often need to smooth
out the required plant building site or hillside roads construction.
Construction in the mountains, at the foot of the mountain often need to smooth
out the required plant building site.
For hillside bulldozing, it is best to use oblique shovel bulldozer apparatus. The
following points can be operated is the bulldozer are not equipped with these devices.
First drive the bulldozer to the area and launched a ground paste edges to make
bulldozer settled
Gradually subparagraph until the soil become loose and then push out the soil
aside.
When pushing the edge, remember to use blade edge. Pull steering clutch slowly
or units like bulldozer clutch, axle and frame characters will easily damage.
Keep a high inside (by the side of the hill) low outside face.This will not only
ensure the slope and face in desired size, but also safer.

Tel:0086-516-83895528
Email:machinery@cnfocusgroup.com


Basic Construction Work Techniques.pdf - page 1/2
Basic Construction Work Techniques.pdf - page 2/2

Related documents


PDF Document basic construction work techniques
PDF Document knowing the history of used1513
PDF Document xcmg motor grader gr180
PDF Document hbxg bulldozer
PDF Document xcmg motor grader gr165
PDF Document xcmg motor grader gr215


Related keywords