PDF Archive

Easily share your PDF documents with your contacts, on the Web and Social Networks.

Share a file Manage my documents Convert Recover PDF Search Help Contact



141110 City Hall .pdf



Original filename: 141110 City Hall.pdf
Title: City Hall LEED Online Checklist.xls
Author: Abena Darden

This PDF 1.4 document has been generated by Microsoft® Office Word 2007, and has been sent on pdf-archive.com on 13/09/2016 at 21:23, from IP address 208.121.x.x. The current document download page has been viewed 244 times.
File size: 172 KB (3 pages).
Privacy: public file




Download original PDF file









Document preview


San Francisco City Hall - Targeting LEED EBOM Platinum rating with 81 points
Project Team Members:
Real Estate Division/City Hall Building Management
Public Utilities Commission
SF Environment
Department of Park & Rec
kW Engineering
Thornton Tomasetti, Inc.
Pestec
Notable Sustainability Highlights:
A plumbing fixture upgrade drastically reduced the amount of potable water
consumed for toilet flushing and hand washing. The building saves over 50% in
indoor water usage of a calculated baseline.
The mechanical and lighting system upgrades and retro-commissioning process
improved energy performance, out performing the national average by over 41%
The City’s purchasing policies means that over 60% of all new electric-powered
equipment is EnergyStar or EPEAT rated; the dollar value is over 70% for all
ongoing consumable sustainable purchases.
A coordinated alternative transportation survey effort resulted in a demonstration
of over 63% of employees using alternative transportation methods to commute
to work.
Project Costs:
Registration- $900
Certification- $10,000
Green Power (Carbon Off-sets) - $1524
Green Power (RECs) - City Bulk Purchase
Energy Retrofits
Mechanical System Upgrades: $306,032
Building Management System upgrades: $123,221
Lighting Upgrades: $237,037
TT Consulting Fee (includes Master Site submission): $58,000

San Francisco City Hall
LEED-EBOM - Credit Overview

Date: November 4th, 2014

IN PLACE

ACHIEVABLE

POSSIBLE

NO

POINT SCORE
COMPLETE

CREDIT NAME & NUMBER

PI 1

Minimum Program Requirements

X

0

0

0

0

PI 2

Project Summary Details

X

0

0

0

0

PI 3

Occupant and Usage Data

X

0

0

0

0

PI 4

Schedule and Overview Documents

X

0

0

0

0

PI 5

Previously LEED Certified Details

X

0

0

0

0

NO.

CREDIT

Project Information

Sustainable Sites
SS 1

LEED Certified Design and Construction

0

0

0

0

4

SS 2

Building Exterior & Hardscape Management Plan

1

0

0

0

0

SS 3

IPM, Erosion Control and Landscape Management Plan

1

0

0

0

0

SS 4

Alternative Commuting Transportation

13

0

0

0

2

SS 5

Reduced Site Disturbance: Protect or Restore Open Space

0

0

0

0

1

SS 6

Stormwater Management

0

0

0

0

1

SS 7.1

Heat Island Reduction: Non-roof

1

0

0

0

0

SS 7.2

Heat Island Reduction: Roof

0

0

0

0

1

SS 8.0

Light Pollution Reduction

0

0

0

0

1

Water Efficiency
WE p1

Minimum Indoor Plumbing Fixture and Fitting Efficiency

X

0

0

0

0

WE 1

Water Performance Measurement: Whole Building

2

0

0

0

0

WE 2

Additional Indoor Plumbing Fixture and Fitting Efficiency

5

0

0

0

0

WE 3

Water Efficient Landscaping

0

0

0

0

5

WE 4

Cooling Tower Water Management

1

0

0

0

1

X

0

0

0

0

EA Prereq. 2 Minimum Energy Efficiency Performance

X

0

0

0

0

EA Prereq. 3 Refrigerant Management: Ozone Protection

X

0

0

0

0

Energy and Atmosphere
EA Prereq. 1

Energy Efficiency Best Management Practices: Planning,
Documentation, and Opportunity Assessment

EA 1

Optimize Energy Performance

16

0

0

0

2

EA 2.1

Existing Building Commissioning: Investigation and Analysis

2

0

0

0

0

EA 2.2

Existing Building Commissioning: Implementation

2

0

0

0

0

EA 2.3

Existing Building Commissioning: Ongoing Commissioning

2

0

0

0

0

EA 3.1

Performance Measurement: Building Automation System

1

0

0

0

0

EA 3.2-3.3

Performance Measurement: System-Level Metering

0

0

0

0

2

EA 4

On-Site and Off-Site Renewable Energy

6

0

0

0

EA 5

Refrigerant Management

0

0

0

0

1

EA 6

Emissions Reduction Reporting

1

0

0

0

0

X

0

0

0

0

Materials and Resources
MR Preq. 1

Sustainable Purchasing Policy

MR Preq. 2

Solid Waste Management Policy

X

0

0

0

0

MR 1

Sustainable Purchasing: Ongoing Consumables

1

0

0

0

0

MR 2.1

Sustainable Purchasing: Durable Goods - Electric Powered Equipment

1

0

0

0

0

MR 2.2

Sustainable Purchasing: Durable Goods - Furniture

0

0

0

0

1

MR 3

Sustainable Purchasing – Facility Alterations & Additions

1

0

0

0

0

MR 4

Sustainable Purchasing: Reduced Mercury in Light Bulbs

1

0

0

0

0

NOTES

San Francisco City Hall
LEED-EBOM - Credit Overview

Date: November 4th, 2014

NO.

CREDIT

IN PLACE

ACHIEVABLE

POSSIBLE

NO

POINT SCORE
COMPLETE

CREDIT NAME & NUMBER

MR 5

Sustainable Purchasing: Food

0

0

0

0

1

MR 6

Solid Waste Management – Waste Stream Audit

1

0

0

0

0

MR 7

Solid Waste Management – Ongoing Consumables

1

0

0

0

0

MR 8

Solid Waste Management – Durable Goods

1

0

0

0

0

MR 9

Solid Waste Management – Facility Alterations & Additions

1

0

0

0

0

EQ Prereq. 1 Minimum IAQ Performance

X

0

0

0

0

EQ Prereq. 2 Environmental Tobacco Smoke (ETS) Control

X

0

0

0

0

NOTES

Indoor Environmental Quality

EQ Preq. 3

Green Cleaning Policy

X

0

0

0

0

EQ 1.1

IAQ Best Management Practices: IAQ Management Program

1

0

0

0

0

EQ 1.2

IAQ Best Management Practices: Outdoor Air Delivery Monitoring

0

0

0

0

1

EQ 1.3

IAQ Best Management Practices: Increased Ventilation

0

0

0

0

1

1

0

0

0

0

0

0

0

0

1

EQ 1.4
EQ 1.5

IAQ Best Management Practices: Reduce Particulates in Air
Distribution
IAQ Best Management Practices: Management for Facility Alterations
and Additions

EQ 2.1

Occupant Comfort: Occupant Survey

0

0

0

0

1

EQ 2.2

Occupant Comfort: Occupant-Controlled Lighting

1

0

0

0

0

EQ 2.3

Occupant Comfort: Thermal Comfort Monitoring

0

0

0

0

1

EQ 2.4

Occupant Comfort: Daylight or Views

0

0

0

0

1

EQ 3.1

Green Cleaning: High-Performance Cleaning Program

1

0

0

0

0

EQ 3.2

Green Cleaning: Custodial Effectiveness Assessment

1

0

0

0

0

EQ 3.3

Green Cleaning: Purchase of Sustainable Cleaning Products and
Materials

1

0

0

0

0

EQ 3.4

Green Cleaning: Sustainable Cleaning Equipment

1

0

0

0

0

EQ 3.5

Green Cleaning: Entryway Systems

1

0

0

0

0

EQ 3.6

Green Cleaning: Indoor Integrated Pest Management

1

0

0

0

0

Innovation & Design Process
IO 1.1

Exemplary WEc2

1

0

0

0

0

IO 1.2

Exemplary WEc1

1

0

0

0

0

IO 1.3

Exemplary TBD

1

0

0

0

0

IO 1.4

Innovation

1

0

0

0

0

IO 2.0

LEED Accredited Professional

1

0

0

0

0

IO 3.0

Documenting Sustainable Building Cost Impacts

1

0

0

0

0

Regional Bonus Credits
RB 1.1

EAc4 (7.5%/62.5%) On-Site and Off-Site Renewable Energy

1

0

0

0

0

RB 1.2

WEc2 (30%) Additional indoor Plumbing Fixture and Fitting Efficiency

1

0

0

0

0

RB 1.3

MRc7 Solid Waste management - Ongoing Consumables

1

0

0

0

0

RB 1.4

EAc1 (85 rating/35%) Optimize Energy Efficiency Performance

1

0

0

0

0

alt 1

SSc4 (75%) Alternative Commuting Transportation

0

0

0

0

*

alt 2

IEQc2.4 Occupant Comfort: Daylight (50%) or Views (45%)

0

0

0

0

*

81

0

0

0

TOTAL PREREQUISITES: 10 0

0

0

TOTAL CREDIT POINTS:

COMPLETED:

81

-

Certified = 40-49
29
Silver = 50-59
Gold = 60-79
0
Platinum = 80-110
29


141110 City Hall.pdf - page 1/3
141110 City Hall.pdf - page 2/3
141110 City Hall.pdf - page 3/3

Related documents


what is green technology1007
141110 city hall
igbc certifiate green lotus avenue
time to go green
growing a sustainable business sgia april11
waste management sources 1 02 2017


Related keywords