SES Paperwork Checklist 10 7 15 (PDF)




File information


Author: Julie

This PDF 1.6 document has been generated by Microsoft® Excel® 2010, and has been sent on pdf-archive.com on 28/11/2016 at 21:37, from IP address 12.87.x.x. The current document download page has been viewed 187 times.
File size: 389.95 KB (1 page).
Privacy: public file




Document preview - SES Paperwork Checklist 10-7-15.pdf - Page 1/1





File preview


Site Eval Scheduling at time of Sale is required on ALL new sales.
The sales rep needs to call 888-495-8225 (8am-8pm Mon-Fri, 9am-5pm Sat) as soon as you close the sale to speak to a scheduling
coordinator to get the site eval scheduled for the customer.

Paperwork Checklist
*** Must be sumitted with ALL deals ***

Customer
Info:
(Print Legibly)

Name:
FULL Address:
Best Phone #:

2nd Phone#:

Email address:

Sales Rep:

Payment Terms:

Contract Price: $

(circle all that apply)

Contract Date:

SR Proposal ID:

Inverter/s:
# of Panels:

SPR Lease #:
MSP (existing):

Panel type:

Ceiling type:

HOA approval required: YES

NO

SunPower
CASH

Sunrun

HERO

Ygrene Greensky

Enerbank

Other_________

_________________
MSP have a lock? YES

Open Beam or

Gated Community? YES

NO

NO

Attic
Code:__________

Panel UPGRADE: YES
NO De-Rate MSP instead? ___________
House: 1 Story
or 2 Story
Sub-panel: YES NO Location: _______________
Trenching for conduit run needed? _________________
ROOF Type: □ Clay Tile □ Double Stacked Tile □ Cement Tile □ Comp Shingle □ FLAT roof Other ______________
Move existing Thermal / DHW? YES NO If yes, how many? _____________
**** NOTES - i.e. Ground mount info, existing thermal info, locked gates, gate codes, dogs in yard, roof notes, etc:

Smart Energy Solar New Deal Requirements






DID YOU CHECK TITLE FOR CORRECT NAMES? Yes No
IS PROPERTY HELD IN A TRUST? Yes No
Customer Utility bill (must show name, property address, electric rate, 12 mnth usage history, account #, meter #)
SES Contract signed by customer & sales rep (only for purchases)
Design layout (must clearly show the panel array on the roof)
SPR 5 pg Lease Proposal (must have customer signature on pg 4, if rate is TOU then bottom of pg 2 also)

Southern California Edison Required Paperwork
□ SCE NEM * UNDER* 10kw (7pg) Form # 14-923

OR □ SCE NEM * OVER* 10kw (7pg) Form # 16-344
(For both NEM forms- only have customer sign pg7- DO NOT fill out form)

□ SCE Authorization Form (fill out everything highlighted in yellow)

San Diego Gas & Electric Required Paperwork
□ SDGE NEM Agreement (4 pg)

□ SDGE Authorization Form

Pacific Gas & Electric Paperwork
□ PG&E NEM Agreement Form # 79-1151A (only have customer sign pg5- DO NOT fill out form)

Los Angeles Dept Water & Power
□ LADWP Interconnection NEM form
□ LADWP Request to Forward Payment Form

REBATE: YES or NO
□ LADWP CSI Compliance Form
□ Energy Audit (http://hes.lbl.gov/consumer)

Imperial Irrigation District
□ Interconnection Agreement
□ CSP Doc Package (3 pgs)
□ Interconnection Application
□ Rule 21 Application * (for all systems over 10kw)
□ Other Utility: _____________________________________________
REBATE: YES or NO
rev: 10/7/15






Download SES Paperwork Checklist 10-7-15



SES Paperwork Checklist 10-7-15.pdf (PDF, 389.95 KB)


Download PDF







Share this file on social networks



     





Link to this page



Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..




Short link

Use the short link to share your document on Twitter or by text message (SMS)




HTML Code

Copy the following HTML code to share your document on a Website or Blog




QR Code to this page


QR Code link to PDF file SES Paperwork Checklist 10-7-15.pdf






This file has been shared publicly by a user of PDF Archive.
Document ID: 0000514139.
Report illicit content