3 Contractor Quote Comparison.pdf


Preview of PDF document 3-contractor-quote-comparison.pdf

Page 1 2 3 4 5 6 7 8

Text preview


15 Year (Roof must be
inspected by manufacturer
prior to the start of any
new roof deck
construction)

Total System
Warranty
Permits
Paid by owner

Included
Subtotal

$0.00

Allowance
Subtotal

$0.00

Subtotal

$750.00
$750.00

Other
4% Credit Card
Convenience Fee
Include the costs of street
permits and police details
as necessary to complete
the work
Include the cost of an
exterior scaffolding stair
access tower
Subtotal

Subtotal

$0.00

General conditions /
cranes / police detail /
street permits

$7,200.00

Stair tower / portable
toilet

$4,900.00

Subtotal

$12,100.00

N t IIncluded
Not
l d d
Permit fees

Painting by others

Discounts
Subtotal

$0.00

Subtotal

$53,440.00

Total

$0.00

Subtotal

$64,650.00

$0.00
$84,421.50

Optional Add-ons
Additional Insulation
1" Insulation, R=5.7
2" Insulation, R=11.4

$2,800.00
$4,250.00

Penthouse Trim
Remove and dispose of
existing wood trim on all 4
sides of penthouse.
Install new PVC trim, prime
and paint to match existing

$3,850.00

Penthouse Roof
Remove and dispose of
existing asphalt shingles
Install new copper drip
edge and shingles similar
to existing

$1,900.00

Payment Terms
10% Deposit
1/2 Balance Due upon Start
1/2 Balance Due on
Completion

Contractors Profit and
Overhead

15%