This PDF 1.5 document has been generated by CorelDRAW X7 / Corel PDF Engine Version 17.5.0.907, and has been sent on pdf-archive.com on 03/02/2017 at 21:20, from IP address 108.49.x.x.
The current document download page has been viewed 1217 times.
File size: 3.08 MB (2 pages).
Privacy: public file
IMPORTANT- INSTALL THESE RAILS FIRST
INSTALLATION INSTRUCTIONS
2017 Honda Ridgeline Mounting Rails
Tools Required:
T50 Torx driver
7/16” Wrench
Remove the 4 upper tie-down hooks. Keep the 8 Torx bolts, but do not reuse the tie-down hooks.
Front, upper tie-down hooks.
Both sides.
Rear, upper tie-down hooks.
Both sides.
Universal Kit # S21001010. Align the parts for assembly as shown.
Rear (tailgate)
Bracket Right,
Mounting Rail Right (passenger)
(Notch is at the
tailgate end)
Screws, 1/4-20 x 3/4LG S.H.C.S
Mounting Rail Left (driver)
Rail Bracket
Front (cab) Bracket
(notice the slotted holes are on the top)
Rear (tailgate) Bracket Left
Tap Plate
5400 S. State Road
Ann Arbor, MI 48108
truck-hero.com
3 1 8 3 0 0 0 4 - 3 0
I t e m N o . 3 1 8 3 0 0 0 4 - 3 0 - 1 6 1 0 DD
Truck Hero, Inc., 2016 Printed in U.S.A.
Slide two of the rail brackets into each rail.
Align with the rail interior prole as shown.
Slide one rail bracket to the front, leaving
the other at the tailgate end of the rail.
(Notch is at the
tailgate end)
With the rail brackets slid into the rails, assemble the brackets as shown. Loosely tighten the screws.
Mounting Rail Left (driver) Mounting Rail Right (passenger)
Rail front, copied on left (driver) and right (passenger)
Tap Plate
Screws
Screws
Rail
Bracket
Tap Plate
Rail Bracket
Tap Plate
Front (cab) bracket
(notice the slotted holes are on the top)
Rear (tailgate) Bracket Left
Rear (tailgate) Bracket Right
With the brackets mounted to the rails, place the rails on the truck. Position the rail so the front
cap pad rmly contacts the bulkhead. Align the brackets so that they line up with the
factory tie-down hook bolt holes, then thread in the factory bolts and tighten.
Tighten the front hardware while pushing down on the rail to make good seal contact
Cap pad
with the truck bed at the same time also pushing the rail forward to keep good
to bulkhead
contact between the cap pad and bulkhead.
Continue to push down on the rail while tightening
the rear bracket hardware.
A
B
Tighten both Torx bolts,
then tighten both Allen
head bolts.
Push down
Tighten both Torx bolts,
then tighten both
Allen head bolts.
Push down
2
2
1
1
REFER TO TRUCK BED COVER INSTALLATION SHEET FOR NEXT STEPS
Truck Hero, Inc., 5400 S. State Road, Ann Arbor, MI 48108
Visit us at truck-hero.com
Honda Ridgeline 2017 Accessory Rails Install.pdf (PDF, 3.08 MB)
Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..
Use the short link to share your document on Twitter or by text message (SMS)
Copy the following HTML code to share your document on a Website or Blog