Apsley St V1 Concept Plan (1).pdf

Text preview
Layout Templat e Version 15/
06
LEGEND
W in
LEGEND.
Sewer Pipe
ter
W in ter
Sum
mer
Su mme
r
North
North
developed length:
(approx) xxm
S/W Pipe
developed length:
(approx) xxm
Down Pipe
DP
Gully Trap
GT
Terminal Vent
TV
SITE PLAN NOTES
Refer to Drainage Plan for specific drainage
information
Refer to sediment control plan in specification and
implement where required.
Driveway – By Stonewood Homes Ltd as shown OR
Driveway and Sump not part of this building
consent
Convey surface water from sealed drive areas to an
appropriate approved outfall.
Dimensions are shown to cladding face
Resource Consent Issues:
1/ No RC Issues known
54. 7m Boundary Line (rec ession plane 54° @ 2.5m)
Driveway 77m² approx
19. 2m Boundary Line (rec ession plane 50° @ 2.5m)
8 107
5 467
SITE INFORMATION
Zone
Wind
Earthquake
Durability
Snow
3
Medium
1
B
N 4 at 50m (up to 0.9 kPa)
1 480
FFL subject to site levels
min 225mm to ground
min 150mm to paved ground
17. 5m Boundary Line (rec ession plane 49° @ 2.5m)
4 033
Apsley Street
BUILDING AREA AND SITE COVERAGE
Net Site Area =
496m²
Building Area (O/V) =
(Includes covered areas)
169.06m²
Actual Site Coverage=
34.08%
1 480
1 500
1 500
1 497
X:\Plans\South Canterbury\2017\Apsley Street\Core Windsor 171 Hip PLAN. layout
23. 00m Boundary Line (recession plane 36° @ 2.5m)
Signed:
Stonewood Homes Sout h Canterbury Ltd
26 Arthur Street, P.O Box 4077
Timaru, New Zealand.
Mobile: +64 27 687 5005
Phone: +64 3 688 2471
Fax:
+64 3 688 2472
Email: chris.karton@stonewood.co.nz
Website: www.stonewood.co.nz
Dat e:
Client :
SITE PLAN
Stonewood Homes
Dr awn By
Che cked By
Proposed Dwelling at:
Craig Garner
XXXX XXXXX
10 Apsley Street, Glenwood, Timaru Standard Plan
Print D ate Sales
2/20/ 2017
Wi ndsor 171 Hip
CK
Subdivision of Lot 7, DP 2980
LBP #
XXXXXX
Scale at A3
1: 200
Job Num ber
Version
Revision
Sheet
XXXXXX
A
1
3
Th is plan is develop ed for the purch ase r and is copyright to
Version:
Stonew ood Ho mes NZ Ltd.
All dimensions and levels ar e to b e ch ecked a nd verified on site by
contr acto r prior to comme nce ment of a ny wo rk
OF
CONCEPT
7