Search


PDF Archive search engine
Last database update: 28 November at 11:44 - Around 76000 files indexed.


Show results per page

Results for «deferred»:


Total: 140 results - 0.058 seconds

Acura Quote 100%

replace engine (Need motor replacement) Cost Deferred Approved X $475.70 $0.00 X $4,370.00 20 Original Customer Requests replace radiator 4.0 (found vehicle has no coolant in engine top tank leaking on radiator) Status Fail Subtotal Cost Deferred Approved Deferred Approved $944.98 $5,790.68 Inspection Recommendations Status Cost Replace oil pump gasket (Found engine oil leak) Fail $1,529.05 Ethanol Treatment (Based on manufacture standards regarding time and/or mileage of the vehicle and after checking available service history at our dealership, we recommend the following:) Fail $25.95 Perform power steering fluid exchange service (Based on manufacture standards regarding time and/or mileage of the vehicle and after checking available service history at our dealership, we recommend the following:) Fail $149.95 See AI-2 Perform power steering system fluid exchange service (Found power steering fluid is excessively discolored) Fail $149.95 See AI-2 Perform brake system fluid exchange (Found brake fluid is excessively discolored) Fail $169.95 See AI-4 Perform alignment (Found steering component(s) excessively worn) Fail $94.95 See AI-6 Perform four wheel alignment (Found strut mount(s) loose/worn/noisy) Fail $94.95 See AI-6 Replace cabin air filter (Found cabin air filter excessively dirty) Fail $65.95 See AI-15 Change engine oil and filter (Found engine oil excessively discolored/dirty) Fail $40.41 See AI-18 Replace rear wiper blade insert (Found windshield wiper blade(s) worn) Fail $15.00 See AI-19 Replace side engine mount (Found broken engine mount) Fail $270.55 See AI-25 Replace front engine mount (Found broken engine mount) Fail $578.47 See AI-25 Diagnose excessive coolant loss (Found coolant contaminated) Fail $165.85 See AI-32 Replace water pump (Found engine coolant leak) Fail $1,080.66 See AI-32 Diagnose check engine light (Found instrument cluster warning light illuminated) Fail $29.95 See AI-36 Replace spark plugs (Based on manufacture standards regarding time and/or mileage of the vehicle and after checking available service history at our dealership, we recommend the following:) Fail $309.00 See AI-37 Replace left outer tie-rod end (Found steering component(s) excessively worn) Fail $266.58 See AI-39 Replace rack and pinion assembly (Found steering component(s) excessively worn, Found steering system leak) Fail $1,627.07 See AI-52 21 Inspection Recommendations Status Cost Deferred Approved Perform 90000 mile service (Based on manufacture standards regarding time and/or mileage of the vehicle and after checking available service history at our dealership, we recommend the following:) Fail $823.00 See AI-54 Replace camshaft seal (Found engine oil leak) Fail $242.36 See AI-55 Replace both rear shock absorbers (Found shock(s)/strut(s) leaking) Fail $697.42 See AI-57 Replace both front struts (Found strut mount(s) loose/worn/noisy) Fail $1,085.70 See AI-72 Replace air filter (Found air filter excessively dirty) Fail $55.95 See AI-76 Replace both front sway-bar links (Found sway-bar bushing(s) excessively worn) Fail $302.80 See AI-78 Replace front sway-bar bushings (Found sway-bar bushing(s) excessively worn) Fail $311.30 See AI-78 Replace right front CV axle (Found CV joint(s) noisy/worn) Fail $630.30 See AI-83 Replace left front CV axle (Found CV joint(s) noisy/worn) Fail $630.30 See AI-83 Replace power steering pump (Found steering component(s) excessively worn, Found steering system leak) Fail $775.97 See AI-84 Replace power steering belt (Found belt(s) excessively glazed) Fail $95.18 See AI-87 Replace serpentine belt (Found belt(s) excessively glazed) Fail $124.23 See AI-87 Replace both valve cover gaskets (Found engine oil leak) Fail $745.48 See AI-91 Diagnose excessively low/contaminated/burnt transmission fluid (Found transmission fluid is excessively discolored) Fail $109.95 See AI-98 Replace crankcase rear main seal (Found engine oil leak) Fail $1,493.84 See AI-100 Replace radiator (Found engine coolant leak) Fail $1,063.96 See AI-145 Perform transmission fluid exchange service (Based on manufacture standards regarding time and/or mileage of the vehicle and after checking available service history at our dealership, we recommend the following:) Fail $127.95 See AI-158 Replace positive battery cable (Found battery cable/terminal excessively corroded) Fail $315.15 See AI-159 Replace hood struts (Found hood strut(s) won't support hood) Fail $205.95 See AI-198 Replace timing belt and water pump (Based on manufacture standards regarding time and/or mileage of the vehicle and after checking available service history at our dealership, we recommend the following:) Fail $1,491.97 See AI-208 Subtotal $17,993.00 Totals, Taxes and Fees Estimate Subtotal Cost $23,783.68 Deferred $0.00 Approved $0.00 Shop Fee $1,740.00 $0.00 Tax $1,786.66 $0.00 22 Totals, Taxes and Fees Estimate Total For "See AI-"

https://www.pdf-archive.com/2017/08/17/acura-quote/

17/08/2017 www.pdf-archive.com

Equifax 6.16.2016 98%

$9,668 $9,668 Current --- $0 0/0/0 Student loan - payment deferred Latest Status:

https://www.pdf-archive.com/2016/06/16/equifax-6-16-2016/

16/06/2016 www.pdf-archive.com

SBCHollinsMerger 92%

Hollins has an endowment of about $164 million, no debt, little deferred maintenance and strong enrollment.

https://www.pdf-archive.com/2015/04/29/sbchollinsmerger/

29/04/2015 www.pdf-archive.com

CBP Form I92 86%

DO NOT WRITE IN THESE BLOCKS – For CBP Use Only Passengers Passengers Deferred Inspected Deferred Port Attach CBP 7507, ICAO Declaration, or I-418, or List Crew below:

https://www.pdf-archive.com/2014/02/23/cbp-form-i92/

23/02/2014 www.pdf-archive.com

The Lairds of Otter 86%

john@claddie.co.uk lynn@claddie.co.uk wendylois_scottie@yahoo.co.uk elise_rankin@hotmail.com The Lairds of Otter -4- HEADINGS Page Preface The Old Laird Origin of the name Fishing rights Arrival of Patrick Rankin Steamer rivalry John MacLachlan meets the laird Kilfinan Bay - 1852 Out of season work - Irish workmen Garry Refurbishment Years of progress James Mackie and Kilfinan Estate Incorporation of Kilfinan Estate Mackie's return to Otter The enlarged Otter Sea freight Annfield parks Keeping the peace Annfield Cottage Ardgadden - deferred Fearnoch Lindsaig Inveryne Drum Lime kilns Lindsaig mill John Logan comes to Otter The laird's household Village life Willie's home 8 11 12 13 13 14 15 16 17 18 19 20 22 23 24 25 25 26 27 28 29 29 30 32 33 34 35 36 37 38 39 The Lairds of Otter -5- HEADINGS Continued Land improved Straightening of Kilfinan burn The Rankin mausoleum Young Patrick The laird's smithy The Misses Rankin The boathouse Red faces The church at Kilbride Family origins Responsibilities to the Church Kilfinan farm - deferred A start on Ardgadden Death of the Old Laird Trusteeship Kilfinan Hotel Jock's Lodge Tighanraidh The Minister's grazing rights The succession Absent laird Jock Scott in bother Tenants at Otter The curling match Short-lived lairds The Major W B Rankin era Factor James Main Pier project The reduction in cultivation Sawmill Bootmaker Leitch 40 41 42 43 44 45 45 47 48 49 51 52 53 54 54 55 56 57 58 59 60 60 61 63 64 65 66 67 67 68 68

https://www.pdf-archive.com/2015/11/09/the-lairds-of-otter/

09/11/2015 www.pdf-archive.com

2016-11-1.ATF Release on Qualcomm Aquiring NXP FINAL 86%

taxes currently owed on its offshore profits may be deferred indefinitely on the offshore cash Qualcomm uses to purchase NXP Semiconductor.

https://www.pdf-archive.com/2016/11/02/2016-11-1-atf-release-on-qualcomm-aquiring-nxp-final/

02/11/2016 www.pdf-archive.com

Transunion 6.16.2016 85%

Dispute an Error $2,000 Open - Current No Missed Payments Payment History Apr 30, 2016 Monthly Payment 2012 U OK OK OK OK OK OK OK OK OK OK OK OK Aug 29, 2011 Last Reported Term 2013 OK OK OK OK OK OK OK OK OK OK OK OK Payment deferred Account Details Limit 2014 OK OK OK 0/0/0 Remarks Closed Date 2015 $0 Times 30/60/90 Days Late Opened Date 2016 -- Amount Past Due Account Status Latest Status:

https://www.pdf-archive.com/2016/06/16/transunion-6-16-2016/

16/06/2016 www.pdf-archive.com

Standlschmaus 06-14 DEF 85%

deferred to Valdaora, Thursday.

https://www.pdf-archive.com/2014/07/23/standlschmaus-06-14-def/

23/07/2014 www.pdf-archive.com

coa falsifyingagovtdocument 03-05-00277-cr 83%

§ 37.09 (West 2003).1 The trial court deferred adjudication and placed Retzlaff on community supervision as called for in a plea bargain agreement.

https://www.pdf-archive.com/2015/02/20/coa-falsifyingagovtdocument-03-05-00277-cr/

20/02/2015 www.pdf-archive.com

5143 - 1732136937416 79%

224414-D) (Incorporated in Malaysia) QUARTERLY FINANCIAL REPORT AS AT 30 SEPTEMBER 2016 CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION Unaudited As at 30-Sep-16 RM ASSETS Non-current Assets Property, pla nt and equipme nt Inve stme nt properti es Intangible assets Other inve stme nts Goodwil l Deferred tax as sets Audite d As at 31-Dec-15 RM 37,743,405 115,024 328,784 939,555 35,802,888 240,656 27,699,521 116,979 376,351 1,160,021 236,101 75,170,312 29,588,973 38,575,814 117,991,184 6,953 1,506,023 97,846,288 51,207,773 127,650,410 1,206,810 113,253,287 255,926,262 293,318,280 Total Assets 331,096,574 322,907,253 EQUITY AND LIABILITIES Equity Attributable to Owners of the Parent Share capita l Share premium Other res erves Reta ined profits Total equity attributable to owners of the Company Non-controlling interests 137,629,276 11,729,738 4,416,726 62,753,594 216,529,334 408,128 132,537,200 2,689,578 4,081,393 51,977,659 191,285,830 (294,780) Total Equity 216,937,462 190,991,050 579,328 226,327 1,123,818 177,229 222,043 689,850 1,929,473 1,089,122 48,257,425 316,475 60,140,746 3,514,993 112,229,639 61,402,920 62,306 61,733,393 21,752 7,606,710 130,827,081 Total Liabilities 114,159,112 131,916,203 Total Equity and Liabilities 331,096,574 322,907,253 0.79 0.73 Current Assets Inve ntories Trade and other receivables Derivative fina nci al assets Tax recoverable Depos its , cash and bank balance s Non-current Liabilities Hire purchase Retirement benefits Deferred tax liabilities Current Liabilities Trade and other payables Hire purchase pa yables Bankers' acceptances Derivative fina nci al liabilities Taxation Net Assets per ordina ry share attri butable to ordinary equity holders of the Compa ny (RM) The condensed consolidated statement of financial position should be read in conjunction with the audited financial statements for the financial year ended 31 December 2015 and the accompanying explanatory notes attached to this quarterly financial report.

https://www.pdf-archive.com/2016/10/21/5143-1732136937416/

21/10/2016 www.pdf-archive.com

PublicList (1) 76%

YRS - Years MOS - Months DYS - Days HRS - Hours DEF - Deferred PROB - Probation SUSP - Suspended SUPV - Supervised UNSUPV - Unsupervised CONC - Concurrent CONS - Consecutive CNT - Count CTY - County REPORT GENERATED FOR COUNTY OF STUTSMAN Community notification is the responsibility of your local law enforcement agency.

https://www.pdf-archive.com/2016/12/14/publiclist-1/

13/12/2016 www.pdf-archive.com

prancha final.ThiagoAbreu.300ppi 76%

COMPLEXO AQUÁTICO GIOVANI CASILO autoria:

https://www.pdf-archive.com/2018/03/08/prancha-final-thiagoabreu-300ppi/

08/03/2018 www.pdf-archive.com

The Great V160 Fluid Challenge Rev1 75%

Chip Schwartz (Lagtime)  Craig Bush (Craig Bush)  Ken Henderson (KenHenderson)  John Firth (Axoman)  Background In the early years, some MKIV enthusiasts attempted to defer from OEM fluid and experiment with a  MTF fluid from Redline. The outcome of this experiment resulted in swelling of the shift shaft seal which  ultimately created leaks and shifting issues. The effect of this issue deferred most future attempts to use  non‐compatible fluids at the sake of damaging a once $2,500 transmission that is now over $5k in  replacement cost. As time has passed since the last produced MKIV TT 6MT in 2001, the OEM fluid has  continued to rise in cost and is eventually feared to become extinct in the coming years due to the  limited number of 6MT vehicles produced.   Objective After  reading many debates in various threads if other fluids were compatible, equivalent  and even  potentially rebadged products for resale by Toyota, I decided to take the on the challenge by putting  three competitors up against the benchmark.    My selection of competitive fluids was based on what is readily available in the North America market  versus a global outlook. Some compatible fluids are still available for the European and Australian  markets from the makers of Esso and Castrol.  Due to complexity of obtaining these fluids from these  other markets is the main reason for selecting the competitors (figure 1) seen below:         1.

https://www.pdf-archive.com/2014/02/23/the-great-v160-fluid-challenge-rev1/

23/02/2014 www.pdf-archive.com

Hans-Wehr 74%

deferred;

https://www.pdf-archive.com/2014/10/21/hans-wehr/

21/10/2014 www.pdf-archive.com

Communique 2016 October December contest graphic design 71%

“progressive reforms” policy has been an escalation in deportations, raids and arrests, and mass arrests of immigrant men, women, and children by In June 2012, the Obama Administration started Deferred Action for Immigration and Customs Enforcement (ICE).

https://www.pdf-archive.com/2017/02/28/communique-2016-october-december-contest-graphic-design/

28/02/2017 www.pdf-archive.com

9 fortenbery FINAL 68%

The National Marine Fisheries Service (NMFS) has delegated or deferred management authority over several EEZ fisheries to the State of Alaska;

https://www.pdf-archive.com/2015/07/22/9-fortenbery-final/

22/07/2015 www.pdf-archive.com

Souvenir&Gift Show- Request A Quote Form 09-2017 67%

Deferred Time Definite (3-5 Day) ZIP/POSTAL CODE 2nd Day Next Day/Express DESTINATION ADDRESS:

https://www.pdf-archive.com/2017/07/27/souvenir-gift-show-request-a-quote-form-09-2017/

27/07/2017 www.pdf-archive.com

2.1 HKFYG Report and Financial Statements 2016.compressed 67%

Miscellaneous expenses 雜項支出 2,979,243 2,626,563 ──────── ──────── 香港青年協會非法定帳目聲明 500,232,638 489,142,721 截至2016年3月31日年度 ──────── ──────── Surplus before other comprehensive (loss)/income 18,726,249 23,921,026 上述截至2016年3月31日年度的數字,雖然來源於香港青年協會相關年度的財務報表,但不構成香港青年協會就該年度的法 其他全面(虧損)/收入前盈餘 ──────── ──────── 定帳目。有關財務報表以英文編製,中文本乃根據英文本翻譯。如兩個版本有歧異,則以英文本為準。根據公司條例第436條 要求披露的與這些法定帳目有關的更多信息如下: Other comprehensive income 其他全面收入 Items that may be reclassified to statement of income or expenditure 香港青年協會將按照公司條例第662(3)條及附表6第3部的要求,按時向公司註冊處處長遞交有關帳目。 其後可重新分類至收入及支出表的項目 香港青年協會的核數師已就該帳目出具審計報告。該審計報告為無保留意見的審計報告;其中不包含審計師在不出具保留意 Net realised gains on disposal of available-for-sale financial assets (2,002,844) (649,620) 出售可供出售金融資產之淨收益 見的情況下以強調的方式提請使用者注意的任何事項,亦不包含根據公司條例第406(2),407(2)或(3)條作出的聲明。 Fair value (losses)/gains on available-for-sale financial assets 可供出售金融資產之公允價值(虧損)/增益 Valuation loss on available-for-sale financial assets 可供出售金融資產之減值損失 (4,574,287) 1,119,088 1,904,613 - 81 Appendix HKFYG LEE SHAU KEE COLLEGE LIMITED STATEMENT OF COMPREHENSIVE INCOME FOR THE YEAR ENDED 31 AUGUST 2015 THE INCORPORATED MANAGEMENT COMMITTEE OF HKFYG LEE SHAU KEE PRIMARY SCHOOL STATEMENT OF COMPREHENSIVE INCOME FOR THE YEAR ENDED 31 AUGUST 2015 香港青年協會李兆基書院有限公司 全面收入表 截至2015年8月31日年度 香港青年協會李兆基小學法團校董會 全面收入表 截至2015年8月31日年度 2015 HK$ 2014 HK$ Income 收入 Government grants 政府資助 Air-conditioning fee received 空調收入 Bank interest income 利息收入 Donations for Teaching and Learning Enhancement Scheme 教與學增進計劃捐款 Other donations 其他外界捐款 Income from sundry sales 銷售收入 Quality Education fund 優質教育基金 Jockey Club life-wide learning fund 香港賽馬會全方位學習基金 Programme income 活動收入 2014 HK$ 277,846 635,135 39,450,181 34,230,600 7,902 5,405 15,558,225 14,339,808 618,061 605,473 Income 收入 30,123,482 25,342,127 179,400 156,300 179 205 500,000 500,000 17,450 5,900 178,240 134,551 4,000 247,800 53,220 56,435 579,821 559,134 Donations 外界捐款 Government subsidy 政府資助 Interest income 利息收入 School fees 學費 Sundry income 其他收入 Grants for capital expenditures 非經常性開支撥款 Expenditure 支出 23,191 14,400 ──────── ──────── 55,935,406 49,830,821 (50,630,946) (44,704,240) ──────── ──────── 5,304,460 5,126,581 - (33,741) Grants for capital expenditures 非經常性開支撥款 523,057 523,057 Sundry income 其他收入 224,690 159,020 ──────── ──────── 32,383,539 27,684,529 (32,261,422) (26,926,289) ──────── ──────── 122,117 758,240 - - ──────── ──────── 122,117 758,240 ════════ ════════ Accumulated fund 累積基金 112,114 37,971 Government grants reserve 政府資助儲備 535,471 466,339 Teaching and Learning Enhancement Scheme 教與學增進計劃 (312,544) 53,895 Deferred capital reserve 非經常性遞延儲備 (212,924) 200,035 4,700,277 4,886,086 ──────── ──────── ════════ ════════ 122,117 758,240 ════════ ════════ Expenditure 支出 Total income less expenditure 年度盈餘 Other comprehensive income for the year 年度其他全面收入 Total comprehensive income for the year 年度總全面收入 Total income less expenditure 年度盈餘 Other comprehensive loss 其他全面虧損 Items that may be reclassified to statement of income or expenditure 其後可重新分類至收入及支出表的項目 Capital expenditures financed by setup fund 由開辦經費資助的非經常性開支 Provision for fee remission 學費減免撥備 Representing 相當於︰ 82 2015 HK$ (604,183) (206,754) ──────── ──────── 4,700,277 4,886,086 ════════ ════════ Accumulated fund 累積基金 5,406,859 4,982,593 Deferred capital reserve 非經常性遞延儲備 (102,399) 110,247 Total comprehensive income for the year 年度總全面收入 Representing 相當於︰ Fee remission reserve 學費減免儲備 (604,183) (206,754) ──────── ──────── 83

https://www.pdf-archive.com/2017/03/19/2-1-hkfyg-report-and-financial-statements-2016-compressed/

19/03/2017 www.pdf-archive.com

Taxing Legal Marijuana | ABI 66%

7/3/2016 Taxing Legal Marijuana:

https://www.pdf-archive.com/2016/07/03/taxing-legal-marijuana-abi/

03/07/2016 www.pdf-archive.com