Search


PDF Archive search engine
Last database update: 17 July at 11:24 - Around 76000 files indexed.


Show results per page

Results for «plasterboard»:


Total: 15 results - 0.035 seconds

Eurothane 100%

Discover Eurothane® G, insulation and plaster-board in one single handy panel • • • • Keymark quality label High insulating value (λD = 0.023 W/mK) Ideal for lofts, walls and ceilings Choice of 3 formats • • • • Saves lots of space Easy to install Sturdy plasterboard that retains its shape Easy to paint or paper over Save time and space for your lofts, walls or ceilings Eurothane® G is the ideal solution for interior insulation that is ready for painting or papering – in one single gesture.

https://www.pdf-archive.com/2015/11/28/eurothane/

28/11/2015 www.pdf-archive.com

AM Part wall sys 88%

From the partition walls designs below you can see the noticeable advantage of using AM-Board solution over the plasterboard design Typical partition wall design STC 33dB STC 39dB Single layer of 12,5 mm plasterboard on each side with no acoustic insulation.

https://www.pdf-archive.com/2016/11/13/am-part-wall-sys/

13/11/2016 www.pdf-archive.com

portfolio davidbiro OP 75%

PHILIPS STONCO COMMERCIAL EXTERNAL LIGHTING FIXTURES 4 5 .0 SECOND FLOOR 1200MM CONCRETE AND STEEL FRAMED STRUCTURE CLADDED WITH ALUCOBOND (SPARKLING IVORY SILVER) REFER TO CASSETTE DETAILS 0° INTERNAL WALLS CLADDED WITH GYPSUM 12MM PLASTERBOARD.

https://www.pdf-archive.com/2016/10/20/portfolio-davidbiro-op/

20/10/2016 www.pdf-archive.com

BROC WEST RESUME 2015 73%

• Transport and delivery of plasterboard and accessories • Coordination of multiple delivery vehicles • Recruitment and training of new employees • Interaction with trade representatives and depots/warehourses • Training of off-siders and new employees • On-site safety management and risk assessment • Vehicle maintenance • Relief manager duties including planning of deliveries, staff and job site coordination, invoicing Resume of Broc West Page 3 employer The Corbett Report (www.corbettreport.com) duration December 2014 - present position Editing and IT Support duties:

https://www.pdf-archive.com/2015/03/04/broc-west-resume-2015/

04/03/2015 www.pdf-archive.com

BROC WEST RESUME 2015 73%

• Transport and delivery of plasterboard and accessories • Coordination of multiple delivery vehicles • Recruitment and training of new employees • Interaction with trade representatives and depots/warehourses • Training of off-siders and new employees • On-site safety management and risk assessment • Vehicle maintenance • Relief manager duties including planning of deliveries, staff and job site coordination, invoicing Resume of Broc West Page 3 employer The Corbett Report (www.corbettreport.com) duration December 2014 - present position Editing and IT Support duties:

https://www.pdf-archive.com/2015/04/08/broc-west-resume-2015/

08/04/2015 www.pdf-archive.com

20. Air & Vapour Barrier System - 07.08.2015 67%

as such needs protection from physical damage by covering with plasterboard or other fire spread limiting sheeting.

https://www.pdf-archive.com/2015/10/09/20-air-vapour-barrier-system-07-08-2015/

09/10/2015 www.pdf-archive.com

AM Molded Foam HD 30mm-2 63%

Fill plasterboard constructions Finishing walls and ceilings Floors - noise reduction - base layer under laminate, wood and other floor coverings Fitting:

https://www.pdf-archive.com/2016/11/13/am-molded-foam-hd-30mm-2/

13/11/2016 www.pdf-archive.com

Copy of AM BOARD 10mm 63%

• Easy to handle • Simple processing - cutting, drilling • Installation on the grill (wood, steel profiles for plasterboard) • Direct mounting • Installing the absorption panel use:

https://www.pdf-archive.com/2016/11/13/copy-of-am-board-10mm/

13/11/2016 www.pdf-archive.com

B&W CI700 Series Brochure 63%

That’s all very well for free-standing models – but what speakers built into brick and plasterboard?

https://www.pdf-archive.com/2017/12/07/b-w-ci700-series-brochure/

07/12/2017 www.pdf-archive.com

Heavins Tool Catalogue 54%

manufactured from Terylene • 5m long - working load 275kg/600lb • Integral ‘J’ style fixing hooks for ease of use SAVE €20 180 lumens light output Magnetic swivel pocket clip Durable aluminium body 3 x AAA Alkaline batteries included Available in red and black SAVE €7 • 3 blade locking angle mechanism • 50% faster cutting • Anti-slip handle • Jet-cut teeth are ideal for plasterboard, man-made boards and most soft timbers Christmas Gifts with all the trimmings 3 SAVE €12 AA Batteries Multi-Pack of 24 AAA Batteries Multi-Pack of 16 €9.99 €7.99 XMS14ENGAA • Chrome vanadium steel • Metric, A/F and Torx key sets • Non-slip, soft-grip coated case XMS14ENGAAA • High-quality chrome vanadium blades • Magnetiser/De-magnetiser • Comfort grip, full sized, non-slip handles • Slotted, Pozidriv and Phillips tips • Ideal for furniture, various trades and toys 7 piece Screwdriver Set and Magnetiser XMS14SCREW €12.99 RRP €24.99 3 Folding Hex Key Sets - A/F, Metric and Torx XMS14HEXSETS €12.99 RRP €24.99 2m FatMax® Keyring Tape SAVE €12 XMS14TAPE2 €2.99 RRP €4.99 SAVE €2 Heavy-Duty Work Socks - Twin Pack XMS14SOCKS €7.99 • 13mm wide blade • Bi-material tough case • Class 2 accuracy RRP €12.99 SAVE €5 SAVE • Designed for use with work boots • Warm, cushioned and supportive • Fit sizes 7-12 4 €5 ™ • • • • • 3 functions:

https://www.pdf-archive.com/2014/11/24/heavins-tool-catalogue/

24/11/2014 www.pdf-archive.com

Fraser Watson Stage 4 Degree Show Drops10 42%

Pipes directing the water to the storage (located in the external wall cavity) Timer Frame Plywood Out-let Ventilation Tower Plasterboard This Ventilation Tower is used to passively ventilate draw the hot stale air out of the building.

https://www.pdf-archive.com/2012/02/21/fraser-watson-stage-4-degree-show-drops10/

21/02/2012 www.pdf-archive.com

Trade Catalogue reduced 42%

Blowlamps PE Pipe Fittings 366 47 Perforated Steel Strapping 54 Petcock 34 Pink Grip 42 Pipe Bender / Spare Guides 33 Pipe Cement 47 Pipe Clips 46 Pipe Collars 46-47 Pipe Cover 43 Pipe Cutters (Plastic) 36 Pipe Freezing Kits 42 Pipe Guide 32 Pipe Lagging 43 Pipe Slice / Cutter 366 Plasson 46 Plasterboard Plugs 53 Plastic Floats 38-39 Pliers 13 Plugs - Basin / Sink / Bath 33 Plumba Thread/Joint 33 Plumbers Mait 33 Plumbers Metal Solder 40 Plumbing Key 41 Plungers 58, 129 Pneumatic Flush Valves 36 Polar Spray 1322 Polypipe 360 Polyplumb 362 Polyplumb Underfloor Heating 41 Power Plungers 33 Powerflow Flux 33 Prem Tape 24 Pressure Release Valve 19 Primofit Couplings 36 Propane Gas 38 Pump Pliers 18 Pump Valves 3 Trading details &

https://www.pdf-archive.com/2016/08/28/trade-catalogue-reduced/

28/08/2016 www.pdf-archive.com

B&W CI600 Series Brochure 39%

Impedance Nominal (min) 8Ω (4Ω) (per channel) 8Ω (4Ω) (per channel) Frame height 315mm (12.4in) 315mm (12.4in) 264mm (10.9in) Frame diameter 240mm (9.5in) 240mm (9.5in) Frame width 221mm (8.7in) 221mm (8.7in) 191mm (7.5in) Cut-out diameter 202mm (8in) 202mm (8in) Cut-out height 279mm (11in) 279mm (11in) 228mm (9in) Depth behind surface 133mm (5.2in) 133mm (5.2in) Cut-out width 183mm (7.2in) 183mm (7.2in) 153mm (6in) Protrusion 4mm (0.2in) 4mm (0.2in) Depth behind surface 95mm (3.7in) 95mm (3.7in) 95mm (3.7in) Protrusion 4mm (0.2in) 4mm (0.2in) 4mm (0.2in) Features overview Pr e- mo un tK it bo x ck tio na l ba fix ing s Op Do g™ ick EQ sw t an ge E Q co ne r  ® Mi dr PMK C6 Swirl    -  BB 6C PMK C6 -  -  -  BB 6C PMK C6 Swirl CCM663 CCM664  Qu  CCM662 HF  Na Ke vla ich sw t r we oti ng t BB 6C Piv uti lus ™ tw ete ee ter ich Pre-mount kit Used in new drywall construction, the PMK identifies the position of the speaker during construction and provides a guide for cutting plasterboard.

https://www.pdf-archive.com/2017/12/07/b-w-ci600-series-brochure/

07/12/2017 www.pdf-archive.com

16. Client Air Sealing Tips - 05.09.2015 30%

Dab Fixed Plasterboard 19 Attic Air Sealing 31 Ducts, Passing Outside Envelope Area Walls &

https://www.pdf-archive.com/2015/10/09/16-client-air-sealing-tips-05-09-2015/

09/10/2015 www.pdf-archive.com

15. General - Hints & Tips for Air Sealing - 04.09.2015 30%

Dab Fixed Plasterboard 19 Attic Air Sealing 5 Roof Light Windows 20 Dropped Ceiling/Soffit 6 Unsealed Cavity Wall - Inside Conditioned Space 21 Boxing Shaft for Piping or Ducts 7 Boxed in Steel Support Girders &

https://www.pdf-archive.com/2015/10/09/15-general-hints-tips-for-air-sealing-04-09-2015/

09/10/2015 www.pdf-archive.com