Search


PDF Archive search engine
Last database update: 28 November at 17:16 - Around 76000 files indexed.


Show results per page

Results for «sediment»:


Total: 60 results - 0.051 seconds

Kingmill20160314-mergedNOV 100%

This location has been impacted by sediment, in stream and along the stream side, due to failed and overwhelmed silt fence.

https://www.pdf-archive.com/2016/04/19/kingmill20160314-mergednov/

19/04/2016 www.pdf-archive.com

Full paper 3doc 92%

Past work has determined that changes to the morphology of these systems is largely dependent on changes to sediment supply in the long term and punctuated events like earthquakes, storms, and tsunamis in the short term.

https://www.pdf-archive.com/2018/01/26/full-paper-3doc/

26/01/2018 www.pdf-archive.com

Hons project FINAL DRAFT Nov 21 88%

Associated with the granophyre and as a result thereof, veins of mobilised sediment occur in a variety of forms, namely rheomorphic vein, schlieren and closed joints.

https://www.pdf-archive.com/2014/03/24/hons-project-final-draft-nov-21/

24/03/2014 www.pdf-archive.com

Meeting Program - 2017 Rev1 - Online View 81%

Engineering Geologists New York – Philadelphia Chapter http://www.aegnyp.org/ Oral Presentation “The Effects of Tide Gates on the Distribution of Heavy Metals in Sediment” Presented by Alexander A.

https://www.pdf-archive.com/2017/05/10/meeting-program-2017-rev1-online-view/

10/05/2017 www.pdf-archive.com

EastChinaSeaSummary 78%

The shallow shelf areas are covered with sediments from the bordering landmasses deposited mainly by the Yangtze and other rivers near the northern part of the sea. Coarser sediments of sand occur farther out, and rocks, muds, and oozes are also found in scattered areas. Seismic profiling indicates that the geologic structure beneath the ocean floor consists of nearly parallel folds, with rock ridges near the northern limits of the East China Sea, near the edge of the continental shelf, and along the Ryukyus. These have afforded barriers for sediment brought down by the great Huang He (Yellow River) and also by the Yangtze. Between the ridges the sediment is up to one mile thick.

https://www.pdf-archive.com/2016/11/26/eastchinaseasummary/

26/11/2016 www.pdf-archive.com

PP Sediment Filter 76%

www.waterfilteruae.com AQUA SEDIMENT FILTER BEST CHOICE PP Sediment Filter LENGTH DIA MICRONS 10 2.5 | 4.5 1 | 5 | 10 | 25 20 2.5 | 4.5 1 | 5 | 10 | 25 30 2.5 | 4.5 1 | 5 | 10 | 25 40 2.5 | 4.5 1 | 5 | 10 | 25 Showroom No.

https://www.pdf-archive.com/2020/02/24/pp-sediment-filter/

24/02/2020 www.pdf-archive.com

PROLINE PLUS 72%

1 205800 Filter housing 2 pieces (cap and cup) 2 263100 Steel reservoir tank i j k e l DESCRIPTION with plastic covering 3 263700 1/4” ball valve for tank 4 206600 Filter housing wrench 5 767201 50 GPD membrane 6 272000 1/4” polythene tube 7 205000 1/4” ball valve 1/4” male tube 8 264900 3/8” – 3/8” + 1/4” drill 9 295201 220 – 24 V 1A transformer 10 294400 shut off (only in version without a pump) 11 746700 300 cc flow restrictor f c b k d a g i d h l with manual ball valve 12 264700 1/4” drain clamp 13 296200 Store tap 14 294100 Low pressure switch 15 294200 High pressure switch 16 291600 Granulated carbon post-filter 17 292900 Membrane container 18 294801 24 V electro valve with mesh filter 19 293500 UP7000 24 Vdc pump 20 - 21 209200 5 μm sediment filter 22 213600 Activated granulated carbon cartridge (GAC) 23 214000 Activated granulated carbon cartridge BLOCK KEY Metallic structure depending on model DESCRIPTION a 5 μm sediment filter b Activated granulated carbon cartridge (GAC) c Activated granulated carbon cartridge BLOCK d Pump transformer e Flow restrictor with ball valve f UP7000 24 Vdc pump g Activated granulated carbon (GAC) post-filter h Membrane container i High pressure switch j Low pressure switch k Tank shut off valve l Reservoir tank m Shut off valve n electro-valve shut up n j e Proline Plus a b c Content Page 01.

https://www.pdf-archive.com/2013/05/13/proline-plus/

13/05/2013 www.pdf-archive.com

vibrio 67%

IMPACT OF THE DEEPWATER HORIZON OIL SPILL ON THE VIBRIO PARAHAEMOLYTICUS TYPE THREE SECRETION SYSTEM..........................8 2.1 Purpose and Hypotheses................................................................................................8 2.2 Materials and Methods..................................................................................................8 2.2.1 Sample Collection...........................................................................................8 2.2.1.1 Sample Locations.............................................................................9 2.2.2 Sample Preparation and Plating....................................................................10 2.2.2.1 Oyster Preparation and Plating......................................................10 2.2.2.2 Water Preparation and Plating.......................................................11 2.2.2.3 Sediment Preparation and Plating..................................................12 2.2.3 Colony Lifting and Hybridization.................................................................13 2.2.3.1 Proteinase-K (Pro-K).....................................................................14 2.2.3.2 Hybridization.................................................................................14 2.2.4 Pathogenic Vp Isolation................................................................................16 2.2.5 DNA Extraction............................................................................................17 2.2.6 Multiplex Polymerase Chain Reaction (PCR) Screening.............................18 2.2.7 Agarose Gel Electrophoresis.........................................................................19 2.2.8 Statistical Analysis........................................................................................20 2.3 Results..........................................................................................................................20 2.3.1 EID Data.......................................................................................................20 2.3.2 Presence/Absence TTSS Chi-Square Analysis.............................................22 2.4 Discussion and Future Research..................................................................................23 2.4.1 Discussion.....................................................................................................23 2.4.2 Future Research............................................................................................28 CHAPTER 3:

https://www.pdf-archive.com/2016/07/26/vibrio/

26/07/2016 www.pdf-archive.com

EP9p12 14water 64%

The totals must be adjusted by subtracting the sediment pool storage (the portion of a lake or reservoir reserved for sediment accumulation during the lifetime of the impoundment) and the volume of water necessary to accommodate dependable yields in other reservoirs and lakes.

https://www.pdf-archive.com/2017/01/16/ep9p12-14water/

15/01/2017 www.pdf-archive.com

Selawik Sheefish 2013 64%

In the spring of 2004, a large area of thawed permafrost slid and carried tundra and sediment into the normally clear Selawik River approximately 30 river miles upstream of the sheefish spawning grounds.

https://www.pdf-archive.com/2015/09/23/selawik-sheefish-2013/

23/09/2015 www.pdf-archive.com

MJ45 specsheet 6-18-13 63%

info@frymaster.com The large cold zone and forward sloping bottom help collect and remove sediment from the frypot to safeguard oil quality and support routine frypot cleaning.

https://www.pdf-archive.com/2014/03/04/mj45-specsheet-6-18-13/

04/03/2014 www.pdf-archive.com

OptionsInWaterFiltration 59%

In the WP-4V system, incoming water first passes through a sediment filter to remove particulate matter, such as rust and silt, and then through a carbon filter to remove chlorine or other contaminants.

https://www.pdf-archive.com/2011/06/09/optionsinwaterfiltration/

09/06/2011 www.pdf-archive.com

EWB Project Submission 59%

Water Sediment Filter ......................................................................................................................................8 2.3.

https://www.pdf-archive.com/2017/07/07/ewb-project-submission/

07/07/2017 www.pdf-archive.com

DerelictGear Placemat FINAL 20170710 17x11 56%

It continues to catch and kill animals and will do so until the gear is either removed from the water, buried by sediment, or the biodegradable escapement devices break down enough so that it no longer can trap animals.

https://www.pdf-archive.com/2017/09/15/derelictgear-placemat-final-20170710-17x11/

15/09/2017 www.pdf-archive.com

The Children of the Killing Jar 55%

      Here  they  stand,  alone  with  the  waves,  feet  sinking  into  the  sediment,  and  now  they  feel   trapped  inside  this  killing  jar,  this  vessel  of  contempt,  drinking  in  their  own  fictions.

https://www.pdf-archive.com/2016/09/17/the-children-of-the-killing-jar/

17/09/2016 www.pdf-archive.com

How to CDC 52%

SEPP CDC checklist send payment instruction memo Section 149 (2) certificate (with minimum 6 months’ validity) payment memo template Landscape Plan Sediment &

https://www.pdf-archive.com/2015/07/29/how-to-cdc/

29/07/2015 www.pdf-archive.com

Crawford Lake Trails Map 52%

This ensures the preservation of annual deposits of sediment called varves.

https://www.pdf-archive.com/2017/03/22/crawford-lake-trails-map/

22/03/2017 www.pdf-archive.com

MY CV 52%

https://www.pdf-archive.com/2014/04/21/my-cv/

21/04/2014 www.pdf-archive.com

PectinolyticFinalPDF 51%

The notable strains were discovered from the aquatic leaf piles, flooded fields, and the water column, and sandy sediment of Carroll Creek (Table 1).

https://www.pdf-archive.com/2015/10/10/pectinolyticfinalpdf/

10/10/2015 www.pdf-archive.com

Turf benefits 51%

Also, any sediment that has also been picked up by the water is invariably trapped within the stand of turfgrass.

https://www.pdf-archive.com/2016/03/04/turf-benefits/

04/03/2016 www.pdf-archive.com

World Wetlands Day 50%

  M ARSH  R ESTORATION  P ROJECT     Mill Pond Marsh    Client  Arrowsic, Maine   The  Nature  Conservancy  retained  Wright‐Pierce  to  conduct  a  topographical  survey  and  prepare  base  mapping  associated  with  the  removal  of  an  existing  private  roadway  and  bridge  crossing  the  salt  marsh  known  as  the  Mill  Pond  Preserve, which is located in Arrowsic, Maine.  The  project  is  funded  through  a  grant  from  Maine’s  In  Lieu  Fee  (ILF)  Program  administered by the Maine Natural Resources Conservation Program (MNRCP).  The  sponsor  for  the  program  is  the  Maine  Department  of  Environmental  Protection.  The  program  serves  as  an  alternative  form  of  compensation  for  impacts to aquatic resources authorized by the New England District Army Corps  of Engineers (and/or the Maine Department of Environmental Protection.   The Nature Conservancy  Project at a Glance     Topographic survey of  marsh crossing   Development of   base mapping      WATER ~ WASTEWATER ~ STORMWATER ~ INFRASTRUCTURE  888.621.8156    www.wright‐pierce.com    W ETLANDS  M ITIGATION  P ROJECTS FOR  MDOT     New Gloucester, Maine   Wright‐Pierce  was  retained  by  Woodlot  Alternatives,  Inc.  to  assist  in  the  development of two projects which had been identified for mitigation of wetland  impacts  associated  with  the  realignment  of  a  portion  of  Route  9  in  New  Gloucester.   The  first  of  the  two  mitigation  efforts  included  re‐grading  and  restoring  the  existing roadway alignment as a wetland in the area of its crossing of Mosquito  Brook.   The second project included stream bank stabilization and habitat improvements  along  a  section  of  the  Royal  River,  as  well  as  the  creation  of  vernal  pools  and  replanting within an area of the floodplain along the river.   Past use of the area for agricultural purposes had resulted in the loss of much of  the natural riparian vegetation and associated habitat values.  The first of the two projects is being completed as a part of the ongoing highway  reconstruction  project.  The  second  project  was  contracted  separately  and  completed in September of 2003.      Client  Woodlot Alternatives, Inc.  Project at a Glance    Woodlot Alternatives, Inc.,   retained Wright‐Pierce to  assist in the development of  two projects for mitigation  of wetland impacts.    The project included the  following tasks:     Regrading and  restoration of the existing  roadway alignment   Stream bank   stabilization and habitat  improvements,   including replanting    WATER ~ WASTEWATER ~ STORMWATER ~ INFRASTRUCTURE  888.621.8156    www.wright‐pierce.com    M ARSH  R ESTORATION  P ROJECT     Ocean Park Marsh    Client  Old Orchard Beach, Maine   In the course of an assessment of flooding issues in the Ocean Park area of the  community,  it  became  evident  that  the  historic  role  of  area  marshes  in  flood  mitigation had deteriorated over time due to the colonization of the marshes by  invasive species, such as phragmites and yellow flag iris. Reduced tidal flushing  associated  with  the  installation  during  the  1990’s  of  a  tide  gate  at  the  marsh  outlet  had  resulted  in  a  considerable  change  in  vegetative  species  due  to  the  reduced salinity.   Wright‐Pierce was retained by the Town to develop a strategy for controlling the  invasive plants in Jordan Park Marsh and to oversee implementation of various  mitigation measures. Wright‐Pierce subcontracted with the York County Soil and  Water Conservation District who developed an invasive plant management plan  to be implemented over a five‐year period.  Town of Old Orchard Beach  Project at a Glance     Hydrologic assessment   of flooding    Invasive species  assessment   Mowing of phragmites   Use of herbicides    The invasive plant management plan included a combination of physical (mowing)  and chemical (herbicides) techniques to control the invasive species.     WATER ~ WASTEWATER ~ STORMWATER ~ INFRASTRUCTURE  888.621.8156    www.wright‐pierce.com    R ESTORATION OF  A QUATIC AND  W ETLAND  H ABATAT       As one of New England's most prominent engineering consultants, Wright‐ Pierce provides engineering assessments, planning, design and permitting  assistance associated with a range of projects that involve enhancement of  aquatic and wetlands habitats.   We have developed excellent working relationships with regulators at the  federal, state and local levels, as well as regional entities and academics. Our  experience with a variety of applications and solutions, at aquatic locations  throughout  New  England,  positions  us  to  provide  expert  advice  to  clients  with respect to the selection of appropriate technologies.   In many cases, these efforts have involved collaboration with a variety of  governmental and non‐governmental entities, such as NOAA, the US Fish &  Wildlife  Service,  state  resource  agencies,  Audubon  and  The  Nature  Conservancy.  Recent and ongoing projects include the following:   Lake restoration / sediment removal   Marsh restoration / enhanced tidal flushing   Beach dune grass restoration   Invasive species management   Dam removal   Culvert replacement/barrier removal   Fishway installation   Stream restoration / morphological assessment   Estuarine water quality improvements   Lake water quality improvements   Non‐point source pollutant management    WATER ~ WASTEWATER ~ STORMWATER ~ INFRASTRUCTURE  888.621.8156    www.wright‐pierce.com 

https://www.pdf-archive.com/2017/02/02/world-wetlands-day/

02/02/2017 www.pdf-archive.com