Search


PDF Archive search engine
Last database update: 03 December at 10:55 - Around 76000 files indexed.


Show results per page

Results for «specified»:


Total: 1000 results - 0.067 seconds

Annex 1 Base Capital Requirements 100%

Monetary Authority of Singapore 12 Guidelines on Criteria for the Grant of a Capital Markets Services Licence (B) Trading in Futures Contracts Regulated Activity Trading in futures contracts (clearing member17) Trading in futures contracts (non-clearing member18) Trading in futures contracts (non-member19) Trading in futures contracts (introducing brokers20) Trading in futures contracts (restricted broker21) Trading in futures contracts (clearing member limited to specified commodity futures contracts22) BCR (S$) 5 million 1 million 1 million 500,000 250,000 1 million 17 Refers to a corporation which is a member of an approved clearing house authorised to operate a clearing facility for futures contracts, where the corporation’s membership is not limited to specified commodity futures contracts.

https://www.pdf-archive.com/2015/06/18/annex-1-base-capital-requirements/

18/06/2015 www.pdf-archive.com

12Patient-Specific Education 98%

(A) The standard and implementation specifications specified in §170.204(b)(3).

https://www.pdf-archive.com/2017/01/23/12patient-specific-education/

23/01/2017 www.pdf-archive.com

12Download and Transmit 97%

(i) Patients (and their authorized representatives) must be able to use internet-based technology to view, download, and transmit their health information to a 3rd party in the manner specified below.

https://www.pdf-archive.com/2017/01/23/12download-and-transmit/

23/01/2017 www.pdf-archive.com

FUTURE MUSIC GROUP 96%

The artist will receive a weekly check or money transfer through PayPal, Bitcoin, or Wire Transfer with the specified percentage of the profit, unless otherwise specified by the artist or by the terms at the bottom of the agreement.

https://www.pdf-archive.com/2016/04/25/future-music-group/

25/04/2016 www.pdf-archive.com

PL 95%

Range -55 Capacitance Range 1 Capacitance Tolerance M Rated Voltage Range 2.5V Dissipation Factor Not to exceed the value specified at 120Hz,20 Leakage Current ESR +105 2500 F 20% 16V DC 0.2CV 100K~300KHz ( A, after 2 minutes) Not to exceed the value specified Endurance Capacitance Change Within 105 Leakage current Not to exceed the value specified Dissipation Factor Not to exceed 150% of the value specified Capacitance Change Within Leakage Current Not to exceed the value specified Dissipation Factor Not to exceed 150% of the value specified 2000Hrs at rated voltage Moisture Resistance Stored at 60 RH90 95% 2000h 20% of the value before test 20% of the value before test Diagram of Dimensions unit Lmax.

https://www.pdf-archive.com/2013/10/18/pl/

18/10/2013 www.pdf-archive.com

12Accept Summary of Care 95%

Certification Criteria* (1) Transitions of care—(i) Send and receive via edge protocol—(A) Send transition of care/referral summaries through a method that conforms to the standard specified in §170.202(d) and that leads to such summaries being processed by a service that has implemented the standard specified in §170.202(a)(2);

https://www.pdf-archive.com/2017/01/23/12accept-summary-of-care/

23/01/2017 www.pdf-archive.com

Kenneth E Slaughter-bd9f8f0ad3ed256 94%

4 R e l a tiv e s Possible Relatives # Nam e Age Addre ss 1 Gerald Lynn Slaughter 55 1116 3 Lawrence 116 3, Mo unt Verno n, MO 6 5712 (0 1/20 0 1 - 0 2/20 0 1) 14 6 0 N Beverly Ave, Springfield, MO 6 580 2 (0 5/19 9 5 - 0 5/19 9 5) 2 Lisa Andrea Bebo ut 56 3 Lee D Slaughter 54 4 Jo e C Slaughter 99 517 E Lo cust St, Springfield, MO 6 580 3 (10 /19 9 5 - 10 /20 0 4 ) 4 719 N Miner Rd, Presco tt Valley, AZ 86 314 No Occupancy Dates Specified 56 70 N Missio n Ln, Presco tt Valley, AZ 86 314 No Occupancy Dates Specified 5 Jim Leo n Slaughter 73 4 30 2 SW 51st Ave Apt 20 2, Amarillo , TX 79 10 9 (0 4 /19 9 3 - 0 8/20 0 4 ) 6 Jerry Dale Slaughter 74 56 70 N Missio n Ln, Presco tt Valley, AZ 86 314 (0 1/20 0 3 - 0 4 /20 0 5) Po Bo x 14 6 7, Payso n, AZ 8554 7 (0 4 /19 84 - 0 4 /20 0 1) 7 Nao mi Slaughter NA 8 Ossie M Slaughter 98 29 4 2 E No rcro ft St, Mesa, AZ 85213 No Occupancy Dates Specified 4 719 N Miner Rd, Presco tt Valley, AZ 86 314 No Occupancy Dates Specified 9 Kipp E Slaughter 51 1121 E Tho man St, Springfield, MO 6 580 3 No Occupancy Dates Specified 1238 McVey St, Mo unt Verno n, MO 6 5712 No Occupancy Dates Specified 10 Samantha Slaughter 25 11 Nao mi Slaughter NA 12 Micah C Slaughter 27 19 22 E 56 4 th Rd, Pleasant Ho pe, MO 6 5725 No Occupancy Dates Specified 517 E Lo cust St, Springfield, MO 6 580 3 No Occupancy Dates Specified 13 Jo seph A Slaughter 29 130 7 E Lakewo o d St, Springfield, MO 6 580 4 (12/20 0 9 - 0 1/20 10 ) 517 E Lo cust St, Springfield, MO 6 580 3 (0 7/20 0 5 - 11/20 0 5) 14 Kimberly K Card 52 74 6 5 Lawrence 1222, Ash Gro ve, MO 6 56 0 4 (0 6 /20 0 6 - 0 7/20 0 6 ) 1116 3 Lawrence Apt 116 3, Mo unt Verno n, MO 6 5712 (0 6 /19 9 8 - 0 6 /19 9 8) 5

https://www.pdf-archive.com/2014/06/18/kenneth-e-slaughter-bd9f8f0ad3ed256/

18/06/2014 www.pdf-archive.com

6-8 93%

6 Extending X'-theory Dr. Waleed A.

https://www.pdf-archive.com/2017/11/13/6-8/

13/11/2017 www.pdf-archive.com

PDF 93%

Pistol Lock, Cleaning Rod And Brush, Owner's Manual And Warranty Registration Card, Storage Container, Magazine Loader, And Specified Number Of Magazines.

https://www.pdf-archive.com/2012/02/04/pdf/

04/02/2012 www.pdf-archive.com

Grimes County As Builts 93%

OpenTech will write the DDC program using the specified values.

https://www.pdf-archive.com/2017/02/21/grimes-county-as-builts/

21/02/2017 www.pdf-archive.com

Improve CNC Productivity with Parametric Programming 93%

If another pocket of a different size must be machined, another G65 command can be easily specified that contains different argument values.

https://www.pdf-archive.com/2016/10/11/improve-cnc-productivity-with-parametric-programming/

11/10/2016 www.pdf-archive.com

Success Stories - Zuken 93%

When specified with thermal insulation it keeps heat within the building and reduces energy costs.

https://www.pdf-archive.com/2017/03/21/success-stories-zuken/

21/03/2017 www.pdf-archive.com

GENERAL TERMS OF PARTICIPATION 92%

Exhibition scheduled for specified date(s) in the participation contract.

https://www.pdf-archive.com/2017/01/31/general-terms-of-participation/

31/01/2017 www.pdf-archive.com

Bunker gear specs 92%

Finally, that the courts concluded “the burden is on the supplier or manufacturer, who has NOT been specified, to convince the specifier that their product is equal for the purpose of a particular project”.

https://www.pdf-archive.com/2017/04/14/bunker-gear-specs/

14/04/2017 www.pdf-archive.com

VIP Hospitality Booking Form 92%

VIP Hospitality Booking Form Circuit:

https://www.pdf-archive.com/2012/04/24/vip-hospitality-booking-form/

24/04/2012 www.pdf-archive.com

Oncology Center AH (1) 92%

by proposing the substitution, the Bidder represents that it has personally investigated the proposed material or product and detennined that it is equal or better in all respects to that specified, that the same or better warranty will be provided for the substitution, that complete cost data, including all direct and indirect costs of any kind, has been presented, that the Contract Time will not be increased, and that it will coordinate the installation of the substitute if accepted and make all associated changes in the Work.

https://www.pdf-archive.com/2018/08/31/oncology-center-ah-1/

31/08/2018 www.pdf-archive.com

Oncology Center controls 92%

by proposing the substitution, the Bidder represents that it has personally investigated the proposed material or product and detennined that it is equal or better in all respects to that specified, that the same or better warranty will be provided for the substitution, that complete cost data, including all direct and indirect costs of any kind, has been presented, that the Contract Time will not be increased, and that it will coordinate the installation of the substitute if accepted and make all associated changes in the Work.

https://www.pdf-archive.com/2018/08/31/oncology-center-controls/

31/08/2018 www.pdf-archive.com

Oncology Center lights 92%

by proposing the substitution, the Bidder represents that it has personally investigated the proposed material or product and detennined that it is equal or better in all respects to that specified, that the same or better warranty will be provided for the substitution, that complete cost data, including all direct and indirect costs of any kind, has been presented, that the Contract Time will not be increased, and that it will coordinate the installation of the substitute if accepted and make all associated changes in the Work.

https://www.pdf-archive.com/2018/08/31/oncology-center-lights/

31/08/2018 www.pdf-archive.com

Oncology Center mechanical 92%

by proposing the substitution, the Bidder represents that it has personally investigated the proposed material or product and detennined that it is equal or better in all respects to that specified, that the same or better warranty will be provided for the substitution, that complete cost data, including all direct and indirect costs of any kind, has been presented, that the Contract Time will not be increased, and that it will coordinate the installation of the substitute if accepted and make all associated changes in the Work.

https://www.pdf-archive.com/2018/08/31/oncology-center-mechanical/

31/08/2018 www.pdf-archive.com

Oncology Center panels lights 92%

by proposing the substitution, the Bidder represents that it has personally investigated the proposed material or product and detennined that it is equal or better in all respects to that specified, that the same or better warranty will be provided for the substitution, that complete cost data, including all direct and indirect costs of any kind, has been presented, that the Contract Time will not be increased, and that it will coordinate the installation of the substitute if accepted and make all associated changes in the Work.

https://www.pdf-archive.com/2018/08/31/oncology-center-panels-lights/

31/08/2018 www.pdf-archive.com

Oncology Center plumbing 92%

by proposing the substitution, the Bidder represents that it has personally investigated the proposed material or product and detennined that it is equal or better in all respects to that specified, that the same or better warranty will be provided for the substitution, that complete cost data, including all direct and indirect costs of any kind, has been presented, that the Contract Time will not be increased, and that it will coordinate the installation of the substitute if accepted and make all associated changes in the Work.

https://www.pdf-archive.com/2018/08/31/oncology-center-plumbing/

31/08/2018 www.pdf-archive.com

Oncology Center pumps 92%

by proposing the substitution, the Bidder represents that it has personally investigated the proposed material or product and detennined that it is equal or better in all respects to that specified, that the same or better warranty will be provided for the substitution, that complete cost data, including all direct and indirect costs of any kind, has been presented, that the Contract Time will not be increased, and that it will coordinate the installation of the substitute if accepted and make all associated changes in the Work.

https://www.pdf-archive.com/2018/08/31/oncology-center-pumps/

31/08/2018 www.pdf-archive.com

RIP report 91%

• RIPv1 routers will sent only Version 1 packets • RIPv1 routers will receive both Version 1 and 2 updates • RIPv2 routers will both send and receive only Version 2 updates We can control the version of RIP a particular interface will “send” or “receive.” Unless RIPv2 is manually specified, a Cisco will default to RIPv1 when configuring RIP.

https://www.pdf-archive.com/2016/12/25/rip-report/

24/12/2016 www.pdf-archive.com