Search


PDF Archive search engine
Last database update: 16 May at 14:24 - Around 76000 files indexed.


Show results per page

Results for «wastewater»:


Total: 48 results - 0.049 seconds

Geosyntec - Water-Wastewater 100%

Wastewater Treatment Services PLANNING STUDIES | WATER &

https://www.pdf-archive.com/2015/10/08/geosyntec-water-wastewater/

08/10/2015 www.pdf-archive.com

Group 16 Submission 2 98%

CURRENT WASTE AND WASTEWATER PRODUCTION MANAGEMENT.........9 4.1.

https://www.pdf-archive.com/2011/10/17/group-16-submission-2/

17/10/2011 www.pdf-archive.com

Wetlands WastewaterTreatment 96%

Tiffan Chilcott Wong GEOL5333 – Wetlands Wetlands as Wastewater Treatment Technology A Review of California Examples In the grand scheme of pollution control technology and the impacts humans have on the environment, wetlands have been used and abused for decades by urban development, agriculture, and indirect poisoning through wastewater systems.

https://www.pdf-archive.com/2010/11/01/wetlands-wastewatertreatment/

01/11/2010 www.pdf-archive.com

MaynardLaw LettertoMayor IoneWastewaterRecommendations 96%

History ofIone's Wastewater Treatment Plant Project and Future Considerations The City's wastewater team is pursuing a project, based on Council direction, which will satisfy the requirements impos~ on the City by the Central Valley Regional Water Quality Control Board ("RWQCl3") at the lowest cost to the ratepayers of lone by incorporating existing infrastructure where possible and by eliminating hidden costs through an open and transparent public process.

https://www.pdf-archive.com/2012/02/02/maynardlaw-lettertomayor-ionewastewaterrecommendations/

02/02/2012 www.pdf-archive.com

CityofIone WastewaterCompliance CRWQCB R5-2011-0019 95%

Mail COMPUANCE WITH CEASE AND DESIST ORDER R!-2011 •.0019, CITY AMADOR COUNTY OF lONE, The City of lone's wastewater treatment plant is regulated by Waste Discharge Requirements 'Order 95-125 and Cease and Desist Order (COO) RS-2011-0019.

https://www.pdf-archive.com/2012/02/02/cityofione-wastewatercompliance-crwqcb-r5-2011-0019/

02/02/2012 www.pdf-archive.com

CCL Introduction Brochure 16-04-15 Email version example pdf 92%

 Water Supply and Wastewater Collection Infrastructure  Road and Bridge Construction;

https://www.pdf-archive.com/2015/04/17/ccl-introduction-brochure-16-04-15-email-version-example-pdf/

17/04/2015 www.pdf-archive.com

selection 91%

Ozone oxidation of cyanide-contaminated wastewater Endorsing Ozone A high rate of success in complex projects globally adds credence to the effectiveness of ozone in the oxidation of cyanide-contaminated wastewater in mineral processing.

https://www.pdf-archive.com/2017/08/23/selection/

23/08/2017 www.pdf-archive.com

ImpactAssessment 91%

Public Service, Traffic, Water and Wastewater Service, Stormwater, and Climate Change impact to the development, the surrounding area, and the Town of Carrboro.

https://www.pdf-archive.com/2016/02/10/impactassessment/

10/02/2016 www.pdf-archive.com

Rubric 88%

Here is how it applies to the sample CITY OF LA CENTER
REQUEST FOR PROPOSALS WASTEWATER TREATMENT EXPANSION PROJECT 1 Scope • When is it due?

https://www.pdf-archive.com/2011/12/13/rubric/

13/12/2011 www.pdf-archive.com

World Wetlands Day 85%

  M ARSH  R ESTORATION  P ROJECT     Mill Pond Marsh    Client  Arrowsic, Maine   The  Nature  Conservancy  retained  Wright‐Pierce  to  conduct  a  topographical  survey  and  prepare  base  mapping  associated  with  the  removal  of  an  existing  private  roadway  and  bridge  crossing  the  salt  marsh  known  as  the  Mill  Pond  Preserve, which is located in Arrowsic, Maine.  The  project  is  funded  through  a  grant  from  Maine’s  In  Lieu  Fee  (ILF)  Program  administered by the Maine Natural Resources Conservation Program (MNRCP).  The  sponsor  for  the  program  is  the  Maine  Department  of  Environmental  Protection.  The  program  serves  as  an  alternative  form  of  compensation  for  impacts to aquatic resources authorized by the New England District Army Corps  of Engineers (and/or the Maine Department of Environmental Protection.   The Nature Conservancy  Project at a Glance     Topographic survey of  marsh crossing   Development of   base mapping      WATER ~ WASTEWATER ~ STORMWATER ~ INFRASTRUCTURE  888.621.8156    www.wright‐pierce.com    W ETLANDS  M ITIGATION  P ROJECTS FOR  MDOT     New Gloucester, Maine   Wright‐Pierce  was  retained  by  Woodlot  Alternatives,  Inc.  to  assist  in  the  development of two projects which had been identified for mitigation of wetland  impacts  associated  with  the  realignment  of  a  portion  of  Route  9  in  New  Gloucester.   The  first  of  the  two  mitigation  efforts  included  re‐grading  and  restoring  the  existing roadway alignment as a wetland in the area of its crossing of Mosquito  Brook.   The second project included stream bank stabilization and habitat improvements  along  a  section  of  the  Royal  River,  as  well  as  the  creation  of  vernal  pools  and  replanting within an area of the floodplain along the river.   Past use of the area for agricultural purposes had resulted in the loss of much of  the natural riparian vegetation and associated habitat values.  The first of the two projects is being completed as a part of the ongoing highway  reconstruction  project.  The  second  project  was  contracted  separately  and  completed in September of 2003.      Client  Woodlot Alternatives, Inc.  Project at a Glance    Woodlot Alternatives, Inc.,   retained Wright‐Pierce to  assist in the development of  two projects for mitigation  of wetland impacts.    The project included the  following tasks:     Regrading and  restoration of the existing  roadway alignment   Stream bank   stabilization and habitat  improvements,   including replanting    WATER ~ WASTEWATER ~ STORMWATER ~ INFRASTRUCTURE  888.621.8156    www.wright‐pierce.com    M ARSH  R ESTORATION  P ROJECT     Ocean Park Marsh    Client  Old Orchard Beach, Maine   In the course of an assessment of flooding issues in the Ocean Park area of the  community,  it  became  evident  that  the  historic  role  of  area  marshes  in  flood  mitigation had deteriorated over time due to the colonization of the marshes by  invasive species, such as phragmites and yellow flag iris. Reduced tidal flushing  associated  with  the  installation  during  the  1990’s  of  a  tide  gate  at  the  marsh  outlet  had  resulted  in  a  considerable  change  in  vegetative  species  due  to  the  reduced salinity.   Wright‐Pierce was retained by the Town to develop a strategy for controlling the  invasive plants in Jordan Park Marsh and to oversee implementation of various  mitigation measures. Wright‐Pierce subcontracted with the York County Soil and  Water Conservation District who developed an invasive plant management plan  to be implemented over a five‐year period.  Town of Old Orchard Beach  Project at a Glance     Hydrologic assessment   of flooding    Invasive species  assessment   Mowing of phragmites   Use of herbicides    The invasive plant management plan included a combination of physical (mowing)  and chemical (herbicides) techniques to control the invasive species.     WATER ~ WASTEWATER ~ STORMWATER ~ INFRASTRUCTURE  888.621.8156    www.wright‐pierce.com    R ESTORATION OF  A QUATIC AND  W ETLAND  H ABATAT       As one of New England's most prominent engineering consultants, Wright‐ Pierce provides engineering assessments, planning, design and permitting  assistance associated with a range of projects that involve enhancement of  aquatic and wetlands habitats.   We have developed excellent working relationships with regulators at the  federal, state and local levels, as well as regional entities and academics. Our  experience with a variety of applications and solutions, at aquatic locations  throughout  New  England,  positions  us  to  provide  expert  advice  to  clients  with respect to the selection of appropriate technologies.   In many cases, these efforts have involved collaboration with a variety of  governmental and non‐governmental entities, such as NOAA, the US Fish &  Wildlife  Service,  state  resource  agencies,  Audubon  and  The  Nature  Conservancy.  Recent and ongoing projects include the following:   Lake restoration / sediment removal   Marsh restoration / enhanced tidal flushing   Beach dune grass restoration   Invasive species management   Dam removal   Culvert replacement/barrier removal   Fishway installation   Stream restoration / morphological assessment   Estuarine water quality improvements   Lake water quality improvements   Non‐point source pollutant management    WATER ~ WASTEWATER ~ STORMWATER ~ INFRASTRUCTURE  888.621.8156    www.wright‐pierce.com 

https://www.pdf-archive.com/2017/02/02/world-wetlands-day/

02/02/2017 www.pdf-archive.com

TOE MO Infrastructure 20170324 82%

Cheryl Norton has been president of Missouri American Water, which provides high quality and reliable water and wastewater services to approximately 1.5 million people, since November 2015.

https://www.pdf-archive.com/2017/03/24/toe-mo-infrastructure-20170324/

24/03/2017 www.pdf-archive.com

Nov9 talk (1) (1) 79%

Join us for our first seminar on Membrane Distillation hybrid systems for treatment of wastewater by Fozia Parveen And an 'all things science' “Wine and Cheese Reception” 6:30 to 8:00 p.m., 9th Nov, Blue Boar Hall, Christ Church College Lets #StartAConversation about the cutting-edge research brewing in our own backyard here in Oxford.

https://www.pdf-archive.com/2016/11/06/nov9-talk-1-1/

06/11/2016 www.pdf-archive.com

2016-4, zaključen 79%

Due to the growing number of residents and tourists in the municipality of Zabljak the problem of maintenance of sewerage networks and wastewater treatment plants is becoming increasingly urgent.

https://www.pdf-archive.com/2017/09/08/2016-4-zaklju-en/

08/09/2017 www.pdf-archive.com

RecallBallotInstructions 70%

Without seeking either alternatives or competitive bids you have pressed for the construction of a new $17 million dollar wastewater plant which would require tripling current sewer rates to finance.

https://www.pdf-archive.com/2012/02/03/recallballotinstructions/

03/02/2012 www.pdf-archive.com

OTC 2015 Full Catalog 68%

Drinking Water, Wastewater, Desalination, Process Water, Pre-Filtration for Membranes, Renewable energy.

https://www.pdf-archive.com/2015/04/01/otc-2015-full-catalog/

01/04/2015 www.pdf-archive.com

Young Scientist USA 2014 62%

Firsova Technology Development of Wastewater Treatment for Climate of Uzbekistan .

https://www.pdf-archive.com/2014/09/19/young-scientist-usa-2014/

19/09/2014 www.pdf-archive.com

WWC Biosolids Recommendations FINAL 62%

The City will strive to treat all wastewater sludge to Class A designation prior to final distribution.

https://www.pdf-archive.com/2017/06/15/wwc-biosolids-recommendations-final/

15/06/2017 www.pdf-archive.com

GRP BIOS AND PHOTOS FINAL 62%

  water/   wastewater   u+lity   to   issue   century   bonds   with   a   100-­‐year   final   maturity.

https://www.pdf-archive.com/2015/08/07/grp-bios-and-photos-final/

07/08/2015 www.pdf-archive.com

wdr2015-9 (002) 61%

“Over the past two years, we’ve focused on leveraging our municipal water and wastewater expertise in industrial markets, where we haven’t always been as active.

https://www.pdf-archive.com/2016/01/20/wdr2015-9-002/

20/01/2016 www.pdf-archive.com

1WorldUnite Water Report (PT1) (1) 60%

FACT REMEMBER TIME 4 CHANGE WORKING TOGETHER We can clean our rivers, canals and waterways and we can also use our voices to demand that water companies better manage this vital resource so that leaking pipes are fixed and wastewater is better managed.

https://www.pdf-archive.com/2017/05/30/1worldunite-water-report-pt1-1/

30/05/2017 www.pdf-archive.com

Government Agencies Checklist 58%

Application for Onsite Wastewater Treatment System Bedroom Equivalents and Fixture Units Worksheet One copy of Floor Plan One copy of Soil Engineering Report Three copies of scaled plot plan (1"

https://www.pdf-archive.com/2017/05/16/government-agencies-checklist/

16/05/2017 www.pdf-archive.com

Tim P Burroughs Dallas 56%

Frontier Oilfield Services, Inc.'s primary business focus on wastewater recovery and disposal has been selected due to the recurring nature of the revenues, the relatively high margins and the strong barriers to entry by potential competitors because of the limited supply of state permitted commercial disposal wells.

https://www.pdf-archive.com/2017/07/03/tim-p-burroughs-dallas/

03/07/2017 www.pdf-archive.com

WastewaterLetter Atlan 56%

As an operator and manager of our wastewater systems.

https://www.pdf-archive.com/2012/02/02/wastewaterletter-atlan/

02/02/2012 www.pdf-archive.com

FETC FAME Hall of Fame March 12 54%

Wastewater and Home Medical Equipment.

https://www.pdf-archive.com/2013/03/12/fetc-fame-hall-of-fame-march-12/

12/03/2013 www.pdf-archive.com

GBU Mountain News XLI - Jan 4, 2014 52%

In August of 2000, the City of Los Angeles purchased a 4,688-acre farm named Green Acres in Kern County to have a place to manage the City’s biosolids produced at the wastewater treatment plants.

https://www.pdf-archive.com/2014/01/07/gbu-mountain-news-xli-jan-4-2014/

07/01/2014 www.pdf-archive.com