Search


PDF Archive search engine
Last database update: 02 December at 14:45 - Around 76000 files indexed.


Show results per page

Results for «yellowstone»:


Total: 12 results - 0.041 seconds

Yellowstone Bison Plan EIS Public Scoping Newsletter1 (1) 100%

Yellowstone-Area Bison Management Plan and Environmental Impact Statement March 2015 The National Park Service and State of Montana Begin a New Plan to Manage Yellowstone-area Bison Your Participation is Requested T Y area Bison Management Plan and Notice of Intent to prepare the Environmental Impact Statement plan/EIS is published in the Federal (plan/EIS).

https://www.pdf-archive.com/2015/03/17/yellowstone-bison-plan-eis-public-scoping-newsletter1-1/

17/03/2015 www.pdf-archive.com

National Parks 86%

BY ME N AT I O N A L PA R K S IN THE USA Yosemite, CA 1 YELLOWSTONE, WYO • • • • • O L D E S T N AT I O N A L PA R K I N THE WORLD &

https://www.pdf-archive.com/2017/10/23/national-parks/

23/10/2017 www.pdf-archive.com

CUEXCOMATE BERALDI 83%

Ciudad Universitaria, 04510 Mexico DF SUMMARY Weathered texture 6m Castle Geyser, Yellowstone National Park Fly Ranch Geyser, Nevada, US 6m Completely surrounded by urban development in the city of Puebla, Mexico, the Cuexcomate (from the Náhuatl ‘cuexcomatl’, meaning ‘bucket’ or ‘pot’) geyser cone deposit has been mistakenly believed to be a ‘small volcano’ by the local population for centuries.

https://www.pdf-archive.com/2017/03/03/cuexcomate-beraldi/

03/03/2017 www.pdf-archive.com

Montana Trip 2017 82%

Montana Trip 2017 Week long trip Spring of 2017 Flights from Manchester to Denver Rent a truck in Denver Unlimited Mileage Drive North through Yellowstone Rent a gorgeous cabin in Bozeman, MT Directly on the banks of Yellowstone River Proceed to following slides for pictures of cabin

https://www.pdf-archive.com/2016/10/18/montana-trip-2017/

18/10/2016 www.pdf-archive.com

planet x paper 63%

Yellowstone’s super volcano might be waking up, as Yellowstone has had over 400 earthquakes in the past week!

https://www.pdf-archive.com/2017/06/23/planet-x-paper/

23/06/2017 www.pdf-archive.com

Aug 22 edition 63%

The busiest traffic in the city was on Yellowstone Avenue and West Broadway Street.

https://www.pdf-archive.com/2018/02/20/aug-22-edition/

20/02/2018 www.pdf-archive.com

Falcon Project Cover Page 1 63%

John Mionczynski is a wildlife consultant with 40 years of {'ield experience, includirrg trapping, radio collaring, and documenting food habits and behavion of grizzly bears in the Yellowstone Ecosystem of Montana and Wyoming for the Interagency lGrizzly Bear Study Team and U.S.

https://www.pdf-archive.com/2016/02/08/falcon-project-cover-page-1/

08/02/2016 www.pdf-archive.com

March 5 edition new 56%

Not enough evidence’ to charge sex crime A3 So close, again Ririe comes in 2nd at state for the second year in a row B1 Trump accuses Obama of tapping his phones, cites no evidenc C1 Waste not, want not FBI probing investment company in Likely option for AMWTP is treating outside waste Idaho Falls n Agents raided Yellowstone Partners this past November B y LUKE RAMSETH news@postregister.com On the morning after the November election, FBI agents raided the Idaho Falls headquarters of Yellowstone Partners, a well-established investment adviser with satellite offices around the West and more than $850 million in assets under management.

https://www.pdf-archive.com/2018/02/20/march-5-edition-new/

20/02/2018 www.pdf-archive.com

oct10 45%

yea, come, buy wine and milk Yellowstone and California (Calistoga) into a volcano as without money and without price.” -Isaiah 55:1 a sign from the Lord that Free Giving should have to be done without fail.

https://www.pdf-archive.com/2018/01/27/oct10/

27/01/2018 www.pdf-archive.com

WVO Final Report B 43%

        CALIFORNIA POLYTECHNIC STATE UNIVERSITY  Alternative Fuels Laboratory  BRAE 434  Spring Quarter 2016              Instructor: Art MacCarley    Solar Waste Vegetable Oil Processor    June 03, 2016                        Andrew Hostler  Steven Schwartz  Chris Chavez  Nathanael DeBruno  Abstract  Every year, countless gallons of vegetable oil are used in the foodservice industry to  make many different kinds of food. This vegetable oil can find a second life in the form of  biodiesel. Currently in Yellowstone National Park, a fleet of buses runs on BioDiesel. This  allows them to reuse much of the food waste from their millions of tourists every year.  Similarly, Cal Poly Corporation on the CPSU campus feeds 20,000 students for most of  the year producing excess food waste. The BioDiesel filtration shed made for our class, EE 434,  allows Cal Poly’s excess food waste to be put to good use. Students at Cal Poly can aquire french  fry oil by the barrel from Cal Poly Corporation. This fuel is then processed for use in the Future  Fuels Club’s multi fuel tractor.    Introduction  The following report is a detailed account of the design, procedure, and materials used to  complete the solar WVO processor located in the alternative fuels shed at Cal Poly. The goal of  this project was to further improve upon the work of students from previous quarters by  automating the WVO conversion process.    Equipment and Materials  ½ inch PVC pipe  ½ inch copper pipe  ⅜ inch copper tubing  ½ inch flexible tubing  ½ inch brackets  Coolant reservoir tank  Screws and anchors  Brass, copper, PVC fittings  24 to 12V buck converter  Temperature sensors  Switches  Custom Arduino board  Hammer drill and accessories  Propane torch        Design Requirements  The main requirement of the project was to implement an easy to use control system for  the processor. First, the control system needed to control the filtering system with the flip of a  switch. This means this one switch would turn on the 12 volt pump, controlling the coolant loop,  and the 24 volt scooter motor, controlling the WVO loop. The control system also needed to  decide when to run the WVO loop which was dependent on the temperature of the coolant  entering the coil of the WVO barrel. Finally the control system needed to shut the system off  when the process was complete.  Along with the control system, the project hardware needed to be brought up to code.  Therefore, all the existing piping needed to be ripped out. The ¾ inch PVC, used for the coolant  loop, that ran from the solar thermal array to the shed was to be replaced by ½ inch PVC. The  flex cable used in the WVO loop that was placed outside of the shed was to replaced with ½ inch  hard copper pipe. Then, the ½ inch PVC and copper piping was to enter through the window of  the shed. Once the piping was inside the shed, flexible pipes could be implemented.  Finally, the system was to be controlled using four batteries wired up to be a 24 volt  supply.    Procedure  First, we ripped out all the existing piping. Then, we connected ½ pvc to the solar thermal  array using two brass fittings and two PVC connectors. Making only 90 degree angles we  connected  all the PVC, using primer and glue for all  connections, for the up and down coolant loop on the roof.  We proceeded to feed the PVC through the window at a  90 degree angle, this was only possible with ½ inch  piping, anything larger would not have fit through the  window. Then, we  connected the pushing  coolant loop directly to the  12 volt pump with all ½  inch PVC pipe, no flex  tubing. On the bottom end  of the pump, we connected flex tubing which was placed in the  coolant reservoir. The falling coolant loop was hard piped to near  the 12 volt pump. From there we switched to the coolant flex pipe  which was connected the copper coil inside of the barrel. At the  bottom of the copper coil, flex tubing was fed into the coolant reservoir. This completed the  coolant loop.    Next, we worked on the copper pipe for the WVO loop. For reference, all connections  were cleaned on the inside and outside of the copper pipe with the designated brush, then flux  was applied on the outside of the pipes before soldering the  copper connections. The copper pipe ran from the 24 volt  pump out of the box, was ran to be flush with the wall, the  two copper lines ran side­by­side up to and through the  window. Then the copper pipe ran down to the wall inside  the shed. From there, we connected the copper tubing. For  testing purposes we left the copper tubing unconnected from  the barrel so we could visually see the WVO loop worked  properly without having to use the barrel for testing. This  completed the WVO loop.  After the piping was completed, we used the hammer  drill to drill holes on the roof and on the walls of the shed,  both inside and outside. The holes were filled with all  purpose anchors, and ½ inch brackets were screwed into the  anchors. Brackets were used on the roof to secure the PVC, on the outside wall to secure the  copper piping,and inside to secure both the PVC and copper piping. Then, the 12 volt pump was  screwed into anchors. Finally, the coolant reservoir was screwed into the anchors in the walls  directly under the 12 volt pump.    Finally, we built in an automated sensing and control system for the shed. This was built  using an Arduino open­source software base, integrating the sensors to an AtMega328 processor.  First, the custom printed circuit board was designed in CadSoft Eagle. This application is  used by many businesses and hobbyists alike to create their own robust microcontroller systems.  The board was then exported to a manufacturing set of files, and sent to Bay Area Circuits for  fabrication.    Next, the board was assembled and  programmed. This board was  modeled after the Arduino  Duemilanove (2009), an early  prototype of the Arduino Uno. As  such, you could program the  processor in an Arduino Uno for  testing, the “pop” the chip into the  board once fully programmed. This  board controlled four low­side switches  in parallel with the manual pump  switches.  Finally, the processor with the Arduino code was tested  with the switches and various sensor readings on the  two temperature sensors. If the Arduino code needs to  be edited in the future, the arduino code is in Appendix  A. Any student wishing to reprogram needs only to swap the processor chip with an Arduino  Uno, program it with modified code from the appendix, then swap the chips back.    Testing  The WVO loop consisting of copper pipe, copper tubing, and the 24 volt scooter motor  was ran for five minutes, using water, with no problems detected. The coolant loop was tested  using the buck converter for the 12 volt pump. Multiple problems arose, the coolant reservoir  used was not large enough to supply the whole loop with enough water to pump through the  whole system. We ran the system until the coolant reservoir was depleted and shut the pump off.  While waiting for the water to return to the reservoir, the water returning to the reservoir was  steaming. As we watched this process, the PVC pipe inside the shed was beginning to droop. The  PVC pipe made its own 90 degree angle because the water that made it to the solar thermal array  became too hot for the PVC to handle. We waited for the PVC to cool down and we tested it  again. This time we used a larger bucket so there was enough water to fill the coolant loop. We  ran this loop for ten minutes and by the end of it the PVC inside the shed on the return loop had  drooped down about an inch. Therefore, the WVO loop and coolant loop work as  planned;however, the PVC pipe just can’t handle the heat of the system.    Conclusion  While the system runs currently, further improvements still need to be made. Firstly, the  PVC pipe used is not adequate for the near boiling water coming out of the solar array.  Additionally, there needs to be a better way to transport oil to and from the processing barrel. 

https://www.pdf-archive.com/2017/03/16/wvo-final-report-b/

16/03/2017 www.pdf-archive.com

1974 Record Releases 28%

Malinski Joey Dee Baby Don't You Know (I Need You) Osibisa Happy Children Yellowstone And Voice Super-Duper Star Velvet Glove Sweet Was My Rose John Kincade 'Till I Kissed You Donny Hathaway Magdelana David Nicholson Get Up Get Out The Robert Farnon Orchestra The Colditz March Neil Diamond Song Sung Blue Billy Cobham Stratus Fleetwood Mac For Your Love 10 - possibly delayed till March 08 February 1974 Ringo Starr You're Sixteen 95 Sunny Doctor's Orders 49 Carpenters Jambalaya (On The Bayou) 46 Eddie Kendricks Boogie Down 30 Contours Baby Hit And Run 25 Steeleye Span Thomas The Rhymer 21 The Whispers A Mother For My Children 12 Rats Don't Let Go 11 John And Rosalind In Memory Of Bruce Lee 10 Billy Preston How Long Has The Train Been Gone 8 Michael Chapman The Banjo Song 6 Roy Harper (Don't You Think We're) Forever 5 Sidney, George And Jackie At The Club 5 Pete Sully The World Jack Jones Fools In Love Buster Superstar Mashmakhan Dance A Little Step Holy Mackerel Tennessee Waltz The Meditations The Great Messiah Chi Coltrane Who Ever Told You Bobbie McGee Nickels And Dimes Owen Gray Jealous Guy Darien Spirit Magic Morning Sun Gemini I'll Be With You Again And Again Design Second Love Don Goodwin This Is Your Song Guy Angier The Days Are Long Gravy Train Starbright Starlight Elkie Brooks Rescue Me Bryan Taylor For The Love Of A Woman 15 February 1974 Bobby Goldsboro Honey 57 Freddie Starr It's You 45 Jimmy Ruffin Tell Me What You Want 29 Bob Dylan On A Night Like This 22 Al Brown And Skin Flesh And Bones Inc Here I Am Baby, Come And Take Me 20 The Sensational Alex Harvey Band The Faith Healer 14 Wilson Pickett Soft Soul Boogie Woogie 13 Lou Reed Caroline Says 12 The New Philharmonia Orchestra Theme Of BBC TV's The Pallisers 12 Howard Werth Lucinda 11 Iron Virgin Jet 8 Redbone We Were All Wounded At Wounded Knee 9 Moments Sexy Mama 8 Crunch Let's Do It Again 8 Farm Fat Judy 7 Gloria Gaynor Honeybee 7 Mike Hart Son, Son 6 Wellington Catch Us If You Can 6 Gallagher And Lyle I Believe In You 6 The Leslie Williams Orchestra The Pallisers 6 The Tony Hatch Orchestra The World At War 6 Cherry Roland Here Is Where The Love Is Bill Cosby Little Ole Man (Up Tight Everything's Alright) Pearly Gates Johnny And The Juke Box George Dekker Pardon Baby Washington I've Got To Break Away Tanya Tucker Blood Red And Goin' Down Jimmy Helms When Can Brown Begin Tom T.

https://www.pdf-archive.com/2016/10/25/1974-record-releases/

25/10/2016 www.pdf-archive.com