Schedule 2 - Authority's Requirements
SCHEDULE 2
AUTHORITY'S REQUIREMENTS
SOUTH LONDON WASTE PARTNERSHIP
RESIDUAL WASTE TREATMENT SERVICE
SCHEDULE 2
AUTHORITY'S REQUIREMENTS
Schedule 2
TABLE OF CONTENTS
Overview
2
PART 1: PERFORMANCE REQUIREMENTS
6
PR1 - WORKS REQUIREMENTS
7
PR2 - COMMISSIONING REQUIREMENTS
16
PR3 - SERVICES REQUIREMENTS
18
PR3.1 Diversion Targets
18
PR3.2 Environmental Management
PR3.3 Operational
Interface
18
21
PR3.4 Facilities and Contract Management
27
PR4 - HANDBACK REQUIREMENTS
34
APPENDIX A -WORKS QUALITY STANDARDS
36
PART 2: PERFORMNCE MANAGEMENT FRAMEWORK
37
PART 3: DEFINITIONS
74
Schedule 2
OVERVIEW
Introduction
.
.
.
.
Project Objective
.
.
Scope of the Service
. ---..
Schedule 2
-Partnership Working
.
.
--
Contract Waste
.
Contract Waste Category A ("Core" Contract Waste streams)
.
-
---- -. --.
.
..... ---
Contract Waste Category B ("Specialist" Contract Waste streams)
Schedule 2
-..
.-..
Contract Waste Category C ("Ad-hoc" Contract Waste streams)
..
- .
---
--.
.
Waste Quantity and Composition
Schedule 2
.
.
-
Schedule 2
PART 1: PERFORMANCE REQUIREMENTS
Part 1 of this Schedule defines the Performance Requirements and is divided into the
following parts:
·
·
·
·
PR1:
PR2:
PR3:
PR4:
Works Requirements
Commissioning Requirements
Services Requirements
Handback Requirements
Appendix A: Works Quality Standards
Subject to the express provisions of the Contract, the Contractor shall comply with the
Works, Commissioning, Services and Handback Requirements in accordance with the
Performance Requirements set out in PR1 to PR4 of Part 1 of this Schedule.
Sections of the Performance Requirements set out Part 1 of this Schedule are subject to
the Performance Management Framework regime set out in Part 2 of this Schedule.
Schedule 2
SCHEDULE 2
AUTHORITY'S REQUIREMENTS
PART 1
PERFORMANCE REQUIREMENTS
PR1 - WORKS REQUIREMENTS
General
1.1 The Contractor shall design and construct the Works in accordance with the Works
Delivery Plan to meet the requirements of PR1.
1.2 The Contractor shall provide Works appropriate for it to manage all Contract Waste
and to process such Contract Waste to meet the requirements of PR3.
1.3 As a minimum, the Works shall meet the Works Quality Standards included in
Appendix A.
.
.
Design and Delivery Requirements
1.6 The Contractor shall provide Works at the Beddington Lane Site and Viliers Road
Site that shall be suitable and efficient for the reception of all vehicles bringing
Contract Waste to the Sites and for vehicle egress from the Sites. The Sites shall be
capable of accepting all vehicles of a size up t
1.7 The Works shall be designed and constructed to ensure that all waste processing
treatment and product storage takes place within enclosed buildings or structures
with appropriate environmental controls provided.
1.8
Schedule 2
Schedule 2 redacted version.pdf (PDF, 6.98 MB)
Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..
Use the short link to share your document on Twitter or by text message (SMS)
Copy the following HTML code to share your document on a Website or Blog