PDF Archive

Easily share your PDF documents with your contacts, on the Web and Social Networks.

Share a file Manage my documents Convert Recover PDF Search Help Contact



OPS 571 Complete Week 4 .pdf


Original filename: OPS 571 Complete Week 4.pdf
Title: OPS 571 Complete Week 4
Author: Dheerender

This PDF 1.5 document has been generated by Microsoft® Office Word 2007, and has been sent on pdf-archive.com on 15/03/2017 at 05:35, from IP address 43.224.x.x. The current document download page has been viewed 215 times.
File size: 255 KB (10 pages).
Privacy: public file




Download original PDF file









Document preview


OPS 571 Complete Week 4
To purchase this material click below link
http://www.ops571assignment.com/OPS571/OPS-571-Complete-Week-4

For more classes visit
www.ops571assignment.com
OPS 571 Week 4 DQ 1
Why would subcontractors for a
government project want their activities
on the critical path? Under what
conditions would they try to avoid being
on the critical path?

OPS 571 Week 4 DQ 2
What was the most complex project that
you have been involved in? Give examples
of the following as they pertain to the
project: the work breakdown structure,

tasks, subtasks, and work package. Were
you on the critical path? Did it have a good
project manager?

OPS 571 Week 4 DQ 3
Watch the "Project Management" video in
the Supply Chain Management Video
Lecture Series.

OPS 571 Week 4 Learning Team Supply
Chain Design Paper
Review the Riordan Manufacturing Virtual
Organization.
Write a paper of no more than 1,400words that includes the following:


Determine Riordan's manufacturing
strategy (chase, level, or combination)
and explain its benefits











Create a process flow diagram for the
electric fan supply chain
Select two metrics to evaluate
performance of the electric fan supply
chain
Describe the supplier relationship and
the effects on the supply chain. As part
of this consider the following:
o Type of relationship
o Supplier location, size of company,
and financial stability
o Metrics used to measure supplier
performance (on-time delivery,
defects, etc)
o Supplier improvement strategies
Describe how lean production
principles may be used to maximize
the efficiency and effectiveness of the
electric fan supply chain process
Select a business forecasting technique
(qualitative or quantitative) for the
electric fans and describe the

forecasting process to be used at
Riordan




Create a sales forecast for electric fans
using selected techniques
Develop Aggregate Production Plan,
Master Schedule, and Materials
Requirement Plans for electric fans
based off the sales forecast. Be sure to
include the following:
o The determination of inventory
requirements of the electric fans
component parts and finished
goods
o The selection of an appropriate
inventory system (fixed order
quantity, two bin method, etc.) to
meet inventory requirements

Click the Assignment Files tab to submit
your assignment.

Begin working on the Week Six
assignment. In Week Six, you propose and
implement new process design and supply
chain processes for the manufacturing of
Riordan's electric fans.

OPS 571 Week 4 Quiz

1.) A work breakdown structure is
a hierarchy of tasks, subtasks, and work
packages
a Cost and Performance tracking schedule
a structure that is incompatible with the
Critical Path Method
a simple list of the activities making up a
project

2.) The vertical axis on a Gantt chart is
usually which of the following?

Activities
Time
Cost
Profit

3.) Which of the following identifies a key
principle of Reengineering?
Organize around tasks.
Downsize (lay-off) workers and do the
same amount of work as before.
Merge information-processing work into
the real work that produces the
information.
Capture information both at the source
and where it is interpreted.

4.) At the onset, a project originates as
which of the following?

A Gantt chart
A series of milestones
Critical path method (CPM)
A statement of work (SOW

5.) Consulting firms typically use which of
the following techniques to plan and
monitor the engagements of the firm or
specific projects?
CPM/PERT
Qualitative forecasting
Materials requirements planning (MRP)
Quantitative layout

6.) A Responsibility Chart specifically
identifies which of the following?
Planning the tasks for a project

Customer satisfaction
Commitment to quality
Level of inventory

7.)Which of the following would be the
result of subdividing a project?
Job orders
Work events
Job categories
Tasks

8.) Which project progress technique
includes the essential features of a project
plan, budgeted cost of work scheduled and
budgeted cost of work performed?
Earned value management
Critical path method

Cost analysis
Gantt chart

9.) An example of a graphic project report
utilized within project management is:
Project proposal
Equipment and supplies chart
Humphrey chart
Cost and performance tracking schedule


Related documents


ops 571 complete week 4
ops 571 week 4 quiz
ops 571 week 4 learning team supply chain design paper
cv jrl
1z0 1001 exam dumps pdf updated 2019
arc vendo link brochure