Progress Report 28 12 2010 .pdf
File information
Original filename: Progress_Report_28_12_2010.pdf
Title: Microsoft Word - Progress Report.docx
Author: Ohad Ozer
This PDF 1.3 document has been generated by Microsoft Word / Mac OS X 10.6.5 Quartz PDFContext, and has been sent on pdf-archive.com on 03/01/2011 at 17:10, from IP address 77.126.x.x.
The current document download page has been viewed 862 times.
File size: 113 KB (3 pages).
Privacy: public file
Share on social networks
Link to this file download page
Document preview
26/12/2010
Progress Report – Manage Engineering Projects System
Page 1
Progress Report – Manage Engineering Projects System
26/12/2010
1. Current Status
•
The existing situation checked deeply.
•
Few meetings took place with the relevant authorities in the departments:
Software engineering, Electrical and Computer Engineering.
In the meetings we discussed about:
o The purpose of the system.
o The necessary functionality of the system, separately to each user
that intend to use the system: Guest, Student, Secretary, Advisor and
Project Supervisor.
o The ARD document was sent to the professional advisor as well, so
the requirements will be clear and to confirm the characterization.
•
The SQL tables and relations configured, currently in draft status.
2. Project Main Purpose
The main purpose of the project it to create product that will actually work in the
university. The main challenge in the project is to create stable system that does not
need any reboot or refresh, it is design to work continuity.
Page 2
Progress Report – Manage Engineering Projects System
26/12/2010
3. Available Systems
The only departments that have a system to manage the engineering project is:
Electrical and Computer Engineering and Information System Engineering. The
system of the Electrical and Computer Engineering department checked deeply, and
we found that the system does not provide the requested implementation and does
not have the ability to serve multiply departments. The system investigation serve
us in order to provide full support to Electrical and Computer Engineering
department in the new system, we will include all the functionality of the older
system.
4. Completed Tasks
•
Existing situation investigation.
•
ARD document.
•
ADD (draft).
5. Semester B Tasks
•
ADD – complete this document, until end of March.
•
Prototype – we are going to write prototype of the system until end of May.
•
Quality Assurance – this process is going to be very deep since the goal is to
create product and not prototype, so this process will be made until the
system will be stable to serve the University.
Page 3



Link to this page
Permanent link
Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..
Short link
Use the short link to share your document on Twitter or by text message (SMS)
HTML Code
Copy the following HTML code to share your document on a Website or Blog