Bond .pdf

File information


Original filename: Bond.pdf

This PDF 1.5 document has been generated by Microsoft® Word 2010, and has been sent on pdf-archive.com on 21/04/2015 at 20:16, from IP address 198.108.x.x. The current document download page has been viewed 400 times.
File size: 137 KB (2 pages).
Privacy: public file


Download original PDF file


Bond.pdf (PDF, 137 KB)


Share on social networks



Link to this file download page



Document preview


Needs for 2015 Bond
Elementary School
 Communication system for playgrounds (speakers)
 Replace roof
 Playground upgrades (sand, edging, wood or rubber chips)
 Repaving/resealing parking lots
 Tinted gymnasium windows (for performances)
 Repair cracked concrete on sidewalks
 Repair cracked window sills
 Repair cracked front boys restroom sink
 New countertops for front girls restroom
 New sinks, counters and drinking fountains
 Carpet replacement
 Front entry door buzzer system
 Replace exterior doors
 New wider, bigger hall vacuum
 Replace hardware and locks on all doors
 New 5th and 6th grade matching desks
 New electronic sign in front of school
 New matching classroom tables
 Garage expansion for storage with heat
Middle/High School
 Auxiliary Gym
 Warning track around softball field
 Softball field fence re-done
 New signage on building
 Signage at entrance to building- “Home of the Rayders”
 Finish team rooms
 Dugouts cleaned and painted
 Foul ball nets for both fields
 Shelving in storage room
 Finish ticket booth
 Soccer dugouts
 Fix sound system in gym
 New floor in art room
 Replace drinking fountains
 Install Kiosk at entry
 New signage
 Parking lot sealed
 Outside building lights replaced
 Curbs fixed by building
 Grass catcher system for mowing fields








New mower
New carpet extractor
Security cameras
Weight room upgrade
Roof repairs
Sprinkler repairs

Auditorium
 LED pit lights
 Spot lights
 Stage needs strip/varnish
 Replace microphones
Kipke Field
 Finish ticket booth
 Re-seed and crown field
 Press box painted
 Install walkway from new ticket booth to existing walkway
 Doors replaced on building
 Re-surface track

District Technology
 Replace fourth generation iPads
 Replace second generation iPads
 Replace Staff Mac Books
 Replace High School iMac labs
 Replace Elementary School PC labs
 Replace High School PC labs
 Replace High School CAD labs
 Replace RLEC South Opti 620 lab
 Replace RLEC North Opti 620 lab
 Replace Opti 780 & LT for office/support staff
 Replace copiers and printers
 New Server SW migration
 Install new server hardware infrastructure
 New firewall
 New network infrastructure
Bus Garage
 Roof Repair
 (6) New buses


Document preview Bond.pdf - page 1/2

Document preview Bond.pdf - page 2/2

Related documents


bond
lot 1
3vr
2 jakov starcevic cv
mx5 checklist 1 1
home checklist

Link to this page


Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..

Short link

Use the short link to share your document on Twitter or by text message (SMS)

HTML Code

Copy the following HTML code to share your document on a Website or Blog

QR Code

QR Code link to PDF file Bond.pdf