Bond (PDF)




File information


This PDF 1.5 document has been generated by Microsoft® Word 2010, and has been sent on pdf-archive.com on 21/04/2015 at 22:16, from IP address 198.108.x.x. The current document download page has been viewed 400 times.
File size: 140.38 KB (2 pages).
Privacy: public file










File preview


Needs for 2015 Bond
Elementary School
 Communication system for playgrounds (speakers)
 Replace roof
 Playground upgrades (sand, edging, wood or rubber chips)
 Repaving/resealing parking lots
 Tinted gymnasium windows (for performances)
 Repair cracked concrete on sidewalks
 Repair cracked window sills
 Repair cracked front boys restroom sink
 New countertops for front girls restroom
 New sinks, counters and drinking fountains
 Carpet replacement
 Front entry door buzzer system
 Replace exterior doors
 New wider, bigger hall vacuum
 Replace hardware and locks on all doors
 New 5th and 6th grade matching desks
 New electronic sign in front of school
 New matching classroom tables
 Garage expansion for storage with heat
Middle/High School
 Auxiliary Gym
 Warning track around softball field
 Softball field fence re-done
 New signage on building
 Signage at entrance to building- “Home of the Rayders”
 Finish team rooms
 Dugouts cleaned and painted
 Foul ball nets for both fields
 Shelving in storage room
 Finish ticket booth
 Soccer dugouts
 Fix sound system in gym
 New floor in art room
 Replace drinking fountains
 Install Kiosk at entry
 New signage
 Parking lot sealed
 Outside building lights replaced
 Curbs fixed by building
 Grass catcher system for mowing fields








New mower
New carpet extractor
Security cameras
Weight room upgrade
Roof repairs
Sprinkler repairs

Auditorium
 LED pit lights
 Spot lights
 Stage needs strip/varnish
 Replace microphones
Kipke Field
 Finish ticket booth
 Re-seed and crown field
 Press box painted
 Install walkway from new ticket booth to existing walkway
 Doors replaced on building
 Re-surface track

District Technology
 Replace fourth generation iPads
 Replace second generation iPads
 Replace Staff Mac Books
 Replace High School iMac labs
 Replace Elementary School PC labs
 Replace High School PC labs
 Replace High School CAD labs
 Replace RLEC South Opti 620 lab
 Replace RLEC North Opti 620 lab
 Replace Opti 780 & LT for office/support staff
 Replace copiers and printers
 New Server SW migration
 Install new server hardware infrastructure
 New firewall
 New network infrastructure
Bus Garage
 Roof Repair
 (6) New buses






Download Bond



Bond.pdf (PDF, 140.38 KB)


Download PDF







Share this file on social networks



     





Link to this page



Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..




Short link

Use the short link to share your document on Twitter or by text message (SMS)




HTML Code

Copy the following HTML code to share your document on a Website or Blog




QR Code to this page


QR Code link to PDF file Bond.pdf






This file has been shared publicly by a user of PDF Archive.
Document ID: 0000222193.
Report illicit content