This PDF 1.5 document has been generated by Microsoft® Word 2010, and has been sent on pdf-archive.com on 21/04/2015 at 22:16, from IP address 198.108.x.x.
The current document download page has been viewed 400 times.
File size: 140.38 KB (2 pages).
Privacy: public file
Needs for 2015 Bond
Elementary School
Communication system for playgrounds (speakers)
Replace roof
Playground upgrades (sand, edging, wood or rubber chips)
Repaving/resealing parking lots
Tinted gymnasium windows (for performances)
Repair cracked concrete on sidewalks
Repair cracked window sills
Repair cracked front boys restroom sink
New countertops for front girls restroom
New sinks, counters and drinking fountains
Carpet replacement
Front entry door buzzer system
Replace exterior doors
New wider, bigger hall vacuum
Replace hardware and locks on all doors
New 5th and 6th grade matching desks
New electronic sign in front of school
New matching classroom tables
Garage expansion for storage with heat
Middle/High School
Auxiliary Gym
Warning track around softball field
Softball field fence re-done
New signage on building
Signage at entrance to building- “Home of the Rayders”
Finish team rooms
Dugouts cleaned and painted
Foul ball nets for both fields
Shelving in storage room
Finish ticket booth
Soccer dugouts
Fix sound system in gym
New floor in art room
Replace drinking fountains
Install Kiosk at entry
New signage
Parking lot sealed
Outside building lights replaced
Curbs fixed by building
Grass catcher system for mowing fields
New mower
New carpet extractor
Security cameras
Weight room upgrade
Roof repairs
Sprinkler repairs
Auditorium
LED pit lights
Spot lights
Stage needs strip/varnish
Replace microphones
Kipke Field
Finish ticket booth
Re-seed and crown field
Press box painted
Install walkway from new ticket booth to existing walkway
Doors replaced on building
Re-surface track
District Technology
Replace fourth generation iPads
Replace second generation iPads
Replace Staff Mac Books
Replace High School iMac labs
Replace Elementary School PC labs
Replace High School PC labs
Replace High School CAD labs
Replace RLEC South Opti 620 lab
Replace RLEC North Opti 620 lab
Replace Opti 780 & LT for office/support staff
Replace copiers and printers
New Server SW migration
Install new server hardware infrastructure
New firewall
New network infrastructure
Bus Garage
Roof Repair
(6) New buses
Bond.pdf (PDF, 140.38 KB)
Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..
Use the short link to share your document on Twitter or by text message (SMS)
Copy the following HTML code to share your document on a Website or Blog