2 2010 Public Meeting Presentation .pdf

File information


Original filename: 2 - 2010 Public Meeting Presentation.pdf
Title: Microsoft PowerPoint - ~4384967.ppt [Compatibility Mode]
Author: kstickle

This PDF 1.3 document has been generated by PScript5.dll Version 5.2.2 / GPL Ghostscript 8.64, and has been sent on pdf-archive.com on 04/11/2015 at 01:39, from IP address 74.140.x.x. The current document download page has been viewed 366 times.
File size: 8.1 MB (38 pages).
Privacy: public file


Download original PDF file


2 - 2010 Public Meeting Presentation.pdf (PDF, 8.1 MB)


Share on social networks



Link to this file download page



Document preview


Cherry Valley/State Route 16
Welcome

Presentations at 4:00, 5:00, and 6:00
November 22, 2010
Cherry Valley Road/State Route 16

1

Project History

Cherry Valley Road / State Route 16

2

Purpose and Need
• Roadway capacity
– Lengthy queues
– Level of Service (LOS) E in p.m. peak hours
• Safety
– 2006-2008 91 crashes
• Transportation Network
– Access for businesses and hospital

Cherry Valley Road / State Route 16

3

Cherry Valley Road/State Route 16
Study Area

Cherry Valley Road / State Route 16

4

Alternatives Considered
• No-Build
• Superstreet
• Interchange
– existing intersection
– east of the existing intersection (State of Ohio
owned property)

Cherry Valley Road / State Route 16

5

No-Build
• Existing intersection would remain as it is
today.
• Only general maintenance would be
completed.
• Dismissed from further consideration as it
does not solve the traffic and safety need.

Cherry Valley Road/ State Route 16

6

Superstreet
• Existing Cherry Valley Road intersection-limited
to right-turn only movements.
• Satellite signals installed downstream and
upstream with u-turns permitted
• Dismissed from further consideration as it does
not solve the long-term traffic and safety need.

Cherry Valley Road/ State Route 16

7

Superstreet

Cherry Valley Road / State Route 16

8

Interchange Alternatives
• All assume 2 lanes of traffic in each direction on Cherry
Valley over State Route 16 with turn lanes where
necessary
• Considered at existing and on ODOT owned property
(old State Route 157 corridor)
• No changes to River Road or Country Club/Church
Street Interchange
• Legal speed for Cherry Valley-35 mph
• Thornwood and the future replacement of the Cherry
Valley bridge are separate/independent projects
Cherry Valley Road / State Route 16

9


Related documents


2 2010 public meeting presentation
bfu 2015 feedback university of wyoming
dry run flyer
city dreams 2 0
01 septemberpbtsacdraftmeetingsummary 09 01 2016
little tokyo workshop synthesized notes 1 24 15

Link to this page


Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..

Short link

Use the short link to share your document on Twitter or by text message (SMS)

HTML Code

Copy the following HTML code to share your document on a Website or Blog

QR Code

QR Code link to PDF file 2 - 2010 Public Meeting Presentation.pdf