Gannt Chart - WBS Mechanical Enginner Scope of Work
ID

Task Name

1
2
3
4
5
6
7
8
9
10
11
12
13

Confirm order all materials from the design
2 wksbill of Sun
quantities
1/1/17
Thu 1/12/17
Catalogue and deliver all materials to appropriate
1 wk
Fri
sites
1/13/17
Thu 1/19/17 1
Mobilise personnel to site offices
2 wks
Fri 1/20/17
Thu 2/2/17 2
Install the rail tracks to speifications 13 wks
Fri 2/3/17
Thu 5/4/17 3
Install rail sidings
6 wks
Fri 2/3/17
Thu 3/16/17 3
Install track interchange infastructure 7 wks
Fri 5/5/17
Thu 6/22/17 4
Install all control and signaling equiptment
11 wks
along the
Fri rail
6/23/17
line
Thu 9/7/17 4,5,6
Install all the boom gates as per the design
8 wks
Fri 5/5/17
Thu 6/29/17 4
Install the required control and signaling
12 wks
software Fri
for 6/30/17
the master control
Thu 9/21/17
room 8
Test the rail tracks under load with actual
4 wks
carriage Fri 9/8/17
Thu 10/5/17 7
Confirm max carriage speed allowable6along
wks the rail
Fri route
10/6/17 Thu 11/16/17 10
Test the air-conditioning system on each
4 wks
carriage
Friand
11/17/17
test the onboard
Thu 12/14/17
fire sprinkler
11
systems
Final testing commissioning and formal5 handover
wks
Fri 12/15/17
Thu 1/18/18 12

Project: Gannt Chart 5
Date: Fri 9/9/16

Duration

Start

Finish

Predecessors

Resource Names
AM
BM
CM
DM
EM
FM
GM
HM
IM
JM
KM
LM
NM

2017
January
February
March
Apri
1/1 1/8 1/15 1/22 1/29 2/5 2/12 2/19 2/26 3/5 3/12 3/19 3/26 4/2
AM
BM
CM
EM

Task

Rolled Up Task

External Tasks

Milestone

Rolled Up Progress

Group By Summary

Progress

Summary

Rolled Up Milestone
Split

Page 1

Project Summary
Deadline

Gannt Chart - WBS Mechanical Enginner Scope of Work
2018
April
May
June
July
August
September
October
November
December
January
4/2 4/9 4/16 4/23 4/30 5/7 5/14 5/21 5/28 6/4 6/11 6/18 6/25 7/2 7/9 7/16 7/23 7/30 8/6 8/13 8/20 8/27 9/3 9/10 9/17 9/24 10/1 10/8 0/1 0/2 0/2 11/5 1/1 1/1 1/2 12/3 2/1 2/1 2/2 2/3 1/7 1/14

DM
FM

GM

HM

Project: Gannt Chart 5
Date: Fri 9/9/16

IM

JM

KM

Task

Rolled Up Task

External Tasks

Milestone

Rolled Up Progress

Group By Summary

Progress

Summary

Rolled Up Milestone
Split

Page 2

Project Summary
Deadline

LM






Download Gannt Chart 5



Gannt Chart 5.pdf (PDF, 2.06 MB)


Download PDF







Share this file on social networks



     





Link to this page



Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..




Short link

Use the short link to share your document on Twitter or by text message (SMS)




HTML Code

Copy the following HTML code to share your document on a Website or Blog




QR Code to this page


QR Code link to PDF file Gannt Chart 5.pdf






This file has been shared publicly by a user of PDF Archive.
Document ID: 0000481695.
Report illicit content