2015 08 06 Current Implementation Plan Graphics (3 sections) (PDF)




File information


Title: Microsoft PowerPoint - Implementation Plan Graphics (revised).pptx
Author: Sebrown

This PDF 1.5 document has been generated by PScript5.dll Version 5.2.2 / Acrobat Distiller 11.0 (Windows), and has been sent on pdf-archive.com on 28/11/2016 at 15:59, from IP address 67.39.x.x. The current document download page has been viewed 474 times.
File size: 380.7 KB (1 page).
Privacy: public file




Document preview - 2015-08-06 Current Implementation Plan Graphics (3 sections).pdf - Page 1/1





File preview


Opportunity Corridor Project
LEGEND
SECTION 1: EAST 105TH CORRIDOR
SECTION 2: NORMAN AVE TO EAST 93RD ST

SECTION 1                
UNDER CONSTRUCTION:  
FALL 2017 COMPLETION

SECTION 3: EAST 93RD ST TO I‐490
TRAFFIC SIGNAL AND SECURITY CAMERA
BRIDGE OVER PROPOSED BOULEVARD
BRIDGE ON PROPOSED BOULEVARD
PEDESTRIAN BRIDGE
STUDY AREA

SECTION 2 
CONSTRUCTION:       
SPRING 2016‐FALL 2018

SECTION 3 
CONSTRUCTION:       
2017‐2020 (TBD)

Revised 08/06/2015






Download 2015-08-06 Current Implementation Plan Graphics (3 sections)



2015-08-06 Current Implementation Plan Graphics (3 sections).pdf (PDF, 380.7 KB)


Download PDF







Share this file on social networks



     





Link to this page



Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..




Short link

Use the short link to share your document on Twitter or by text message (SMS)




HTML Code

Copy the following HTML code to share your document on a Website or Blog




QR Code to this page


QR Code link to PDF file 2015-08-06 Current Implementation Plan Graphics (3 sections).pdf






This file has been shared publicly by a user of PDF Archive.
Document ID: 0000514082.
Report illicit content