This PDF 1.5 document has been generated by PScript5.dll Version 5.2.2 / Acrobat Distiller 11.0 (Windows), and has been sent on pdf-archive.com on 28/11/2016 at 15:59, from IP address 67.39.x.x.
The current document download page has been viewed 474 times.
File size: 380.7 KB (1 page).
Privacy: public file
Opportunity Corridor Project
LEGEND
SECTION 1: EAST 105TH CORRIDOR
SECTION 2: NORMAN AVE TO EAST 93RD ST
SECTION 1
UNDER CONSTRUCTION:
FALL 2017 COMPLETION
SECTION 3: EAST 93RD ST TO I‐490
TRAFFIC SIGNAL AND SECURITY CAMERA
BRIDGE OVER PROPOSED BOULEVARD
BRIDGE ON PROPOSED BOULEVARD
PEDESTRIAN BRIDGE
STUDY AREA
SECTION 2
CONSTRUCTION:
SPRING 2016‐FALL 2018
SECTION 3
CONSTRUCTION:
2017‐2020 (TBD)
Revised 08/06/2015
2015-08-06 Current Implementation Plan Graphics (3 sections).pdf (PDF, 380.7 KB)
Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..
Use the short link to share your document on Twitter or by text message (SMS)
Copy the following HTML code to share your document on a Website or Blog