PDF ArchiveHistorical archive . public document

Progress Report

Progress_Report_28_12_2010.pdf . by Ohad Ozer

PDF 1.3 3 pages 115.43 KB Filed 28/12/2010
Download this PDF
Progress_Report_28_12_2010.pdf
Web reader . 3 pages
Page 2 of 3, Progress Report 28 12 2010
2 / 3

File preview

26/12/2010       Progress  Report  –  Manage  Engineering  Projects  System                             Page  1   Progress  Report  –  Manage  Engineering  Projects  System       26/12/2010         1. Current  Status   • The  existing  situation  checked  deeply.   • Few  meetings  took  place  with  the  relevant  authorities  in  the  departments:     Software  engineering,  Electrical  and  Computer  Engineering.     In  the  meetings  we  discussed  about:   o The  purpose  of  the  system.   o The  necessary  functionality  of  the  system,  separately  to  each  user   that  intend  to  use  the  system:  Guest,  Student,  Secretary,  Advisor  and   Project  Supervisor.   o The  ARD  document  was  sent  to  the  professional  advisor  as  well,  so   the  requirements  will  be  clear  and  to  confirm  the  characterization.   • The  SQL  tables  and  relations  configured,  currently  in  draft  status.       2. Project  Main  Purpose   The  main  purpose  of  the  project  it  to  create  product  that  will  actually  work  in  the   university.  The  main  challenge  in  the  project  is  to  create  stable  system  that  does  not   need  any  reboot  or  refresh,  it  is  design  to  work  continuity.             Page  2   Progress  Report  –  Manage  Engineering  Projects  System   26/12/2010           3. Available  Systems   The  only  department  that  has  a  system  to  manage  the  engineering  project  is:   Electrical  and  Computer  Engineering.  This  system  checked  deeply,  and  we  found   that  the  system  does  not  provide  the  requested  implementation  and  does  not  have   the  ability  to  serve  multiply  departments.  The  system  investigation  serve  us  in  order   to  provide  full  support  to  Electrical  and  Computer  Engineering  department  in  the   new  system,  we  will  include  all  the  functionality  of  the  older  system.     4. Completed  Tasks   • Existing  situation  investigation.   • ARD  document.   • ADD  (draft).     5. Semester  B  Tasks   • ADD  –  complete  this  document,  until  end  of  March.   • Prototype  –  we  are  going  to  write  prototype  of  the  system  until  end  of  May.   • Quality  Assurance  –  this  process  is  going  to  be  very  deep  since  the  goal  is  to   create  product  and  not  prototype,  so  this  process  will  be  made  until  the   system  will  be  stable  to  serve  the  University.             Page  3  

Download Progress Report 28 12 2010

Progress_Report_28_12_2010.pdf . PDF . 115.43 KB . 3 pages

Download PDF

File information

File name
Progress_Report_28_12_2010.pdf
Title
Progress Report
Author
Ohad Ozer
Size
115.43 KB
Pages
3 pages
PDF version
1.3
Produced with
Microsoft Word / Mac OS X 10.6.5 Quartz PDFContext
Filed on
28/12/2010
Page views
905
Document ID
progress-report-28-12-2010
MD5
1b997b4dad2ed689ca929f2104e2feba
SHA-512
87abe922a68a4699ad289b852d22d2b04f9ae77e62ca6da93657a72cb6c3c502c2b6b94017a792de4805935a3d0ab7aa03897535fbd417722e614446faf0e1fd

Share this document

This address never changes. It is the one to keep, to send, or to cite.

Shorter, for a text message or a post with a character limit.

To link to this document from a website or a blog.